Dream Gardens 130 ft Main Boulevard is connected with main Defence Road, which is not only functional for the flow of traffic and wide entrance to the 4000 kanals scheme but it is also significant for the new phases and boulevards.
300 days of progress with Passion:
Security Nowadays security is the need of the hour and to ensure a fully secured community for the client and visitors, Dream Gardens has hired G4S WACKENHUT Security Services along with their and active and energetic security guards who are providing following security features:
---- Entrance Check Posts
---- Security Surveillance Cameras
---- 24/7 Patrolling Security Guards
Gated Community
---- Boundary Wall
Dream Gardens is surrounded by a sound boundary wall which has already been completed to ensure the security.
Horticulture Dream Gardens Main Boulevard has beautiful landscape and horticulture. Lush green belts and flowers are the point of attraction at the entrance. Construction of 17.92 kanals huge park is under process in block B.
Development Works Development Works at Dream Gardens is processing day and night, which can be witnessed in these pictures. It is an open invitation for public to visit and see the development works being carried out at the site.
Wide Roads Dream Gardens Main Boulevard is 130 ft wide. Minimum width of roads in Dream Garden is 40 ft in accordance to the need of the day. These wide carpeted roads with lush green belts are completed under the supervision of Izhar - Monnoo expertise.
---- Analyzing Construction of Roads
---- Block A: 80% of roads are completed
---- Block B: 60% of roads are completed
---- Block C: 40% of roads are completed
Water Supply Water supply has been started at Dream Gardens. Sewerage System In Dream Gardens Block A, B & C has a 100% completed sewerage system.