AGL 40.20 Increased By ▲ 0.04 (0.1%)
AIRLINK 130.26 Decreased By ▼ -1.47 (-1.12%)
BOP 6.70 Increased By ▲ 0.01 (0.15%)
CNERGY 4.57 Increased By ▲ 0.10 (2.24%)
DCL 9.01 Increased By ▲ 0.19 (2.15%)
DFML 41.26 Increased By ▲ 0.65 (1.6%)
DGKC 84.80 Increased By ▲ 0.72 (0.86%)
FCCL 32.69 Increased By ▲ 0.35 (1.08%)
FFBL 75.47 Increased By ▲ 6.86 (10%)
FFL 11.52 Increased By ▲ 0.17 (1.5%)
HUBC 110.50 Decreased By ▼ -1.26 (-1.13%)
HUMNL 14.31 No Change ▼ 0.00 (0%)
KEL 5.25 Increased By ▲ 0.03 (0.57%)
KOSM 8.85 Decreased By ▼ -0.13 (-1.45%)
MLCF 39.30 Decreased By ▼ -0.13 (-0.33%)
NBP 60.75 Increased By ▲ 0.46 (0.76%)
OGDC 195.40 Increased By ▲ 0.46 (0.24%)
PAEL 26.70 Increased By ▲ 0.01 (0.04%)
PIBTL 7.54 Increased By ▲ 0.06 (0.8%)
PPL 155.57 Decreased By ▼ -0.20 (-0.13%)
PRL 27.14 Increased By ▲ 0.46 (1.72%)
PTC 18.06 Decreased By ▼ -0.24 (-1.31%)
SEARL 81.93 Decreased By ▼ -1.09 (-1.31%)
TELE 8.34 Increased By ▲ 0.11 (1.34%)
TOMCL 34.60 Increased By ▲ 0.05 (0.14%)
TPLP 9.10 Increased By ▲ 0.29 (3.29%)
TREET 17.28 Increased By ▲ 0.58 (3.47%)
TRG 62.54 Increased By ▲ 0.09 (0.14%)
UNITY 27.60 Increased By ▲ 0.16 (0.58%)
WTL 1.37 Increased By ▲ 0.09 (7.03%)
BR100 10,387 Increased By 200.2 (1.97%)
BR30 31,505 Increased By 169 (0.54%)
KSE100 97,043 Increased By 1496.6 (1.57%)
KSE30 30,113 Increased By 535.2 (1.81%)
Pakistan

Power shortfall reaches 6,500MW mark

RECORDER REPORT LAHORE: Power shortfall has reached to 6500MW due to short supply of fuel to thermal power plants. Re
Published June 12, 2012

  RECORDER REPORT

LAHORE: Power shortfall has reached to 6500MW due to short supply of fuel to thermal power plants. Resultantly power outages intensified both on domestic and commercial fronts. Especially, the industrial units on independent and grouped feeders are the worst hit, as exemption from load shedding has already been withdrawn leading to capacity closures across the board.

However, the NTDC sources said power shortfall is not more than 4482MW with generation of 4417MW through hydel, 1212MW through thermal and 5739MW through IPPs respectively. Meanwhile, power supply to KESC stood at 700MW.

The urban and rural areas witnessed load shedding for 12 and 18 hours respectively. Many urban areas are also short of water supplies, adding salt to public worries.

Comments

Comments are closed.