BR100 Increased By (0.59%)
BR30 Increased By (1.07%)
KSE100 Increased By (0.46%)
KSE30 Increased By (0.52%)
AGHA 6.61 No Change ▼ 0.00 (0%)
BECO 4.24 Increased By ▲ 0.07 (1.68%)
BML 61.45 Increased By ▲ 2.76 (4.7%)
BOP 28.81 Increased By ▲ 0.23 (0.8%)
CNERGY 12.80 Increased By ▲ 0.09 (0.71%)
CSIL 5.56 Increased By ▲ 0.09 (1.65%)
FCCL 51.99 Increased By ▲ 0.52 (1.01%)
FFL 14.02 Increased By ▲ 0.01 (0.07%)
FNEL 1.12 No Change ▼ 0.00 (0%)
KEL 5.91 Decreased By ▼ -0.03 (-0.51%)
KOSM 5.44 Decreased By ▼ -0.03 (-0.55%)
LOTCHEM 25.82 Decreased By ▼ -0.49 (-1.86%)
MLCF 90.45 Increased By ▲ 0.64 (0.71%)
NBP 159.27 Increased By ▲ 0.47 (0.3%)
NCPL 49.08 Increased By ▲ 0.82 (1.7%)
NPL 52.43 Decreased By ▼ -0.08 (-0.15%)
OGDC 302.25 Increased By ▲ 2.51 (0.84%)
PACE 9.86 Increased By ▲ 0.16 (1.65%)
PAEL 33.73 Increased By ▲ 0.14 (0.42%)
PIBTL 13.71 Decreased By ▼ -0.01 (-0.07%)
PPL 219.25 Increased By ▲ 1.78 (0.82%)
PRL 103.76 Increased By ▲ 4.57 (4.61%)
PTC 55.06 Increased By ▲ 3.90 (7.62%)
SSGC 23.02 Increased By ▲ 0.40 (1.77%)
TBL 9.77 Increased By ▲ 0.42 (4.49%)
TELE 7.23 Increased By ▲ 0.18 (2.55%)
TPL 20.67 Decreased By ▼ -0.11 (-0.53%)
TPLP 11.87 Increased By ▲ 0.05 (0.42%)
TREET 23.60 Decreased By ▼ -0.39 (-1.63%)
TRG 55.47 Decreased By ▼ -1.08 (-1.91%)
Pakistan

PIMS fire: here’s the full text of interim inquiry report

Published Updated
Photo: AFP
Photo: AFP

Prime Minister Shehbaz Sharif ordered on Saturday the immediate suspension of eight officials of the Pakistan Institute of Medical Sciences (PIMS), including the Executive Director Imran Sikandar.

The names were identified by an inquiry committee as responsible for the PIMS neonatal ward fire that claimed the lives of at least 14 children.

The inquiry found that PIMS had no detailed standard operating procedures (SOPs) or training for dealing with fire or other emergency situations. Of the hospital’s 13 SOPs, references to fire or emergency situations were found in only two subsections.

It also found that no supervisory staff was present on duty when the incident occurred. Two nurses, a female security guard and a house officer were present in the ward at the time.

Read the full text of the interim inquiry report below, which details the committee’s findings on the PIMS fire, including lapses in fire safety, emergency response, and the responsibilities of officials.

Comments

200 characters remaining