According to reports, the local residents were protesting against the incessant load shedding and attacked a grid station on Pindi Road and damaged the main door of the station.
The demonstrators, while expressing their agony, told that 20 hours of power failure during the holy month of Ramazan is unjust with the people, and demanded to end the unannounced load shedding on priority basis.