According to Radio Pakistan, three turbines have been installed along with the Ahmedpur Branch canal at a cost of Rs 80 million.
The overhead reservoir with a capacity of ten thousand water gallons and an underground storage tank with a capacity of one hundred thousand gallons of water will be completed by the end of this month.