Pakistan Steel on Thursday clarified that the track of the "Pakistan Steel Flyover" at Quaidabad was not damaged, as reported in the press, but only a small portion of old approach road to the ramp (Airport side - towards Swedish Technical Institute) gave in due to the sub soil sewerage leakage in the area.
A statement issued here said that the defect was rectified by the contractor on the same night and now the traffic was flowing smoothly over the said bridge on both sides.-PR