Pakistan Steel clarifies news report

24 Aug, 2007

Pakistan Steel on Thursday clarified that the track of the "Pakistan Steel Flyover" at Quaidabad was not damaged, as reported in the press, but only a small portion of old approach road to the ramp (Airport side - towards Swedish Technical Institute) gave in due to the sub soil sewerage leakage in the area.
A statement issued here said that the defect was rectified by the contractor on the same night and now the traffic was flowing smoothly over the said bridge on both sides.-PR

Read Comments