Motorway renovation project: PMIC chief dissatisfied with quality of work

18 Jun, 2016

Chairman Prime Minister Inspection Commission (PMIC) Colonel Saif Qureshi (Retd) has expressed his dissatisfaction over the quality of work and material being used in motorway renovation project. According to a statement issued here, Colonel Saif Qureshi (Retd) while inspecting the motorway renovation project on Friday directed chief engineer PMIC Qaiser Abbas to draw the sample for laboratory testing.
The difficult areas damaged and humped at four locations of Kalar Kahar since last few years was the focus of inspection. Imported geo material, crushed stones filter material, and special blocks of retaining walls were checked for quality and timely completion. Substandard drain system has caused the damage to the road, therefore drain system was specially checked. The perforated plastic pipes being used were checked for quality and durability. FWO Project Commander Lieutenant Colonel Qamar explained the technical works undertaken by the FWO, which is responsible for 20 years duration of maintenance works. He said that the renovation work is better than the original work.

Read Comments