LDA DG supervises post-rain WASA operation

28 Aug, 2016

Director General Lahore Development Authority, Nabeel Javed, personally supervised the post-rain operation of WASA for disposal of storm water from various localities of the city on Saturday, in the wake of heaviest downpour during the current monsoon season.
Heavy shower up to 110mm was recorded in one hour in Garden Town, Gulberg and adjoining areas on Saturday. The Director General visited these areas for monitoring the arrangements made by WASA at these locations. He directed the staff concerned for ensuring optimum utilization of the available machinery for quick drainage of rain water. He wanted removing all impediments in the early disposal of rain water, especially form low laying areas of the city.

Read Comments