There are also eight new schemes in Public Sector Developemnt Programme (PSDP) 2018-19 with total estimated cost of Rs8,561.00 million. National Highway Authority (NHA) is playing a vital role in improving the quality of Pakistan's road network, which entails in improving the quality and standard of life of the people apart from creating job opportunities.
The present NHA network comprises of 47 national highways, motorways, expressways, and strategic roads while Current length of this network is 12,743 Km. Through China Pakistan Economic Corridor (CPEC), the NHA is connecting Khunjrab to Gwadar and currently there are ongoing CPEC projects worth Rs700 billion related to NHA.
Western Alignment of the CPEC has 2,463 km length which starts from Khunjrab and passing through Burhan (Hakla), DI Khan (Yarik), Zhob,Quetta,Surab and Hoshab terminates at Gwadar. Its 615 Khunjrab- Raikot section has been completed, Raikot Thakot is at Planning stage, 188 km Thakot-Havelian section is ongoing, 60 km Havelian- Burhan section has been complted, 285 km Burhan (Hakla)- Yarik (DIKhan) is ongoing, PC-I approved Detailed Design 235 km Yarik (DIKhan)- Zhob is in Process, while PC-I of 331 km Zhob Quetta has been approved. Surab-Hoshab (N-85) and Hoshab- Gwadar (M-8) have been completed. Central Alignment projects of the CPEC include 229 km DI Khan - DG. Khan section, 303 km DG Khan – Dera Allahyar section and 94 km Dera Allahyar - Wangu Hills.
Their Feasibility Study Plan in 2025 2025-30 2 303 Feasibility Study Plan in 2025 while thiwer implementation would be done between 2025-30. As far as Eastern Alignment of the CPEC is concerned it has total distance of 2,686 km and its starts from Khunjrab and passes through Thakot,Mansehra,Burhan, Pindi Bhatian,Faisalabad,Multan,Sukkur -Shikarpur,Ratto Dero,Khuzdar,Basima and Hoshab and terminates at Gwadar. About 793 km section of Eastern Alignment from Khunjrab- Burhan is common as Western alignment.
The Eastern Alignment projects completed so far include Khunjerab-Raikot,Havelian-Burhan section, Peshawar-Islamabad Motorway,Islamabad-Lahore Motorway, Pindi Bhattian-Multan Motorway,Sukkur-Shikarpur Mootrway, Rato Dero-Quba Saeed Khan-Khuzdar road, and Basima Gawadar section. More sections of the eastern alignment are in the implementation stage.