AGL 38.15 Decreased By ▼ -1.43 (-3.61%)
AIRLINK 125.07 Decreased By ▼ -6.15 (-4.69%)
BOP 6.85 Increased By ▲ 0.04 (0.59%)
CNERGY 4.45 Decreased By ▼ -0.26 (-5.52%)
DCL 7.91 Decreased By ▼ -0.53 (-6.28%)
DFML 37.34 Decreased By ▼ -4.13 (-9.96%)
DGKC 77.77 Decreased By ▼ -4.32 (-5.26%)
FCCL 30.58 Decreased By ▼ -2.52 (-7.61%)
FFBL 68.86 Decreased By ▼ -4.01 (-5.5%)
FFL 11.86 Decreased By ▼ -0.40 (-3.26%)
HUBC 104.50 Decreased By ▼ -6.24 (-5.63%)
HUMNL 13.49 Decreased By ▼ -1.02 (-7.03%)
KEL 4.65 Decreased By ▼ -0.54 (-10.4%)
KOSM 7.17 Decreased By ▼ -0.44 (-5.78%)
MLCF 36.44 Decreased By ▼ -2.46 (-6.32%)
NBP 65.92 Increased By ▲ 1.91 (2.98%)
OGDC 179.53 Decreased By ▼ -13.29 (-6.89%)
PAEL 24.43 Decreased By ▼ -1.25 (-4.87%)
PIBTL 7.15 Decreased By ▼ -0.19 (-2.59%)
PPL 143.70 Decreased By ▼ -10.37 (-6.73%)
PRL 24.32 Decreased By ▼ -1.51 (-5.85%)
PTC 16.40 Decreased By ▼ -1.41 (-7.92%)
SEARL 78.57 Decreased By ▼ -3.73 (-4.53%)
TELE 7.22 Decreased By ▼ -0.54 (-6.96%)
TOMCL 31.97 Decreased By ▼ -1.49 (-4.45%)
TPLP 8.13 Decreased By ▼ -0.36 (-4.24%)
TREET 16.13 Decreased By ▼ -0.49 (-2.95%)
TRG 54.66 Decreased By ▼ -2.74 (-4.77%)
UNITY 27.50 Decreased By ▼ -0.01 (-0.04%)
WTL 1.29 Decreased By ▼ -0.08 (-5.84%)
BR100 10,089 Decreased By -415.2 (-3.95%)
BR30 29,509 Decreased By -1717.6 (-5.5%)
KSE100 94,574 Decreased By -3505.6 (-3.57%)
KSE30 29,445 Decreased By -1113.9 (-3.65%)

The Nazim Gulshan Town, Abdul Wahab khan has said that construction of pedestrian bridge near the entrance of Federal Urdu University was postponed due to some technical problems that would be removed soon but for the time being speed breakers are being constructed to relief the students from traffic hazards.
He expressed these views at a session held at City District Office, which was attended by Nazim Karachi Naimatullah Khan, EDO Transport, Executive Engineer Water & Sewerage and officers of Advertisement Department.
Gulshan Town Nazim said that when the survey regarding the pedestrian bridge was conducted it was known that the spot where the pillars of the bridge were to be installed, a 33" sewerage line was passing through the same spot that could be hazardous for the bridge shortly after its construction, that's why the project was halted.
City Nazim directed the concerned officers to immediately shift the sewerage line through co-ordination and directed the advertising department to remove hoardings from the site, he further ordered that bridge should be completed within two months.
Gulshan Town Nazim assured the City Nazim that the problems would be solved soon and added that for the time being construction of ramble strip Speed Breakers have been started under the supervision of EDO Transport.

Copyright Pakistan Press International, 2004

Comments

Comments are closed.