AGL 40.00 No Change ▼ 0.00 (0%)
AIRLINK 129.06 Decreased By ▼ -0.47 (-0.36%)
BOP 6.75 Increased By ▲ 0.07 (1.05%)
CNERGY 4.49 Decreased By ▼ -0.14 (-3.02%)
DCL 8.55 Decreased By ▼ -0.39 (-4.36%)
DFML 40.82 Decreased By ▼ -0.87 (-2.09%)
DGKC 80.96 Decreased By ▼ -2.81 (-3.35%)
FCCL 32.77 No Change ▼ 0.00 (0%)
FFBL 74.43 Decreased By ▼ -1.04 (-1.38%)
FFL 11.74 Increased By ▲ 0.27 (2.35%)
HUBC 109.58 Decreased By ▼ -0.97 (-0.88%)
HUMNL 13.75 Decreased By ▼ -0.81 (-5.56%)
KEL 5.31 Decreased By ▼ -0.08 (-1.48%)
KOSM 7.72 Decreased By ▼ -0.68 (-8.1%)
MLCF 38.60 Decreased By ▼ -1.19 (-2.99%)
NBP 63.51 Increased By ▲ 3.22 (5.34%)
OGDC 194.69 Decreased By ▼ -4.97 (-2.49%)
PAEL 25.71 Decreased By ▼ -0.94 (-3.53%)
PIBTL 7.39 Decreased By ▼ -0.27 (-3.52%)
PPL 155.45 Decreased By ▼ -2.47 (-1.56%)
PRL 25.79 Decreased By ▼ -0.94 (-3.52%)
PTC 17.50 Decreased By ▼ -0.96 (-5.2%)
SEARL 78.65 Decreased By ▼ -3.79 (-4.6%)
TELE 7.86 Decreased By ▼ -0.45 (-5.42%)
TOMCL 33.73 Decreased By ▼ -0.78 (-2.26%)
TPLP 8.40 Decreased By ▼ -0.66 (-7.28%)
TREET 16.27 Decreased By ▼ -1.20 (-6.87%)
TRG 58.22 Decreased By ▼ -3.10 (-5.06%)
UNITY 27.49 Increased By ▲ 0.06 (0.22%)
WTL 1.39 Increased By ▲ 0.01 (0.72%)
BR100 10,445 Increased By 38.5 (0.37%)
BR30 31,189 Decreased By -523.9 (-1.65%)
KSE100 97,798 Increased By 469.8 (0.48%)
KSE30 30,481 Increased By 288.3 (0.95%)

Sindh Chief Secretary Mohammed Aslam Sanjarani on Tuesday paid a detailed three-hour visit to Lyari Expressway from Mauripur Bridge to Sohrab Goth.
During the visit, he was accompanied by Karachi DCO Mir Hussain Ali and the project director, Lyari Expressway Resettlement Project, Shafiqur Rehman Paracha.
The chief secretary reviewed the pace of work at Mauripur Bridge, Bihar Colony. Shershahm Bakra Piri, Dhobhi Ghat, Old Golimar, Gujro Nullah, Tin Hattai, Liaquatabad, Sir Shah Suleman Road, Lasbella, Rashid Minhas Road, F.B. Area, Gulshan-e-Iqbal and Sohrab Goth.
He appreciated the performance of the City District Government, the Lyari Expressway Development Project and the National Highway Authority, and called for timely completion of the schemes.
At the end of the visit, LEW and NHA Project Director Barakzai gave a briefing and assured that 75 percent work will be completed by December 2004.
The Sindh chief minister directed that a presentation on the rehabilitation package be given at the next meeting, and expressed the desire that all development schemes of Sindh, including mega projects of Karachi be completed as per directive of the President.
He directed the project director and the city government to get the right of way at the earliest, and hand it over to NHA and speed up the work on available right of way.
Aslam Sanjarani observed that completion of the Expressway will prove a milestone in solving the problems of people and providing better traffic system and transport facilities.
During the briefing, he was informed that so far the city government has achieved over 16 km right of way and handed over the same to NHA.
The Chief Secretary directed that 60 percent right of way be made available by September 15 and 75 percent by December.
After completion of Lyari Expressway, the 16.5-km journey will he covered in 20 minutes. It will have no speed-breaker or signal facilitating the traffic flow on one hand and reducing noise and pollution on the other as the vehicles will move at the designed speed of 80-km an hour.
The Expressway will have barbed fenced on both sides to stop entry of animals.
It was pointed out that it will not be possible to dump garbage into the river while existing one will be cleared.

Copyright Associated Press of Pakistan, 2004

Comments

Comments are closed.