AIRLINK 191.84 Decreased By ▼ -1.66 (-0.86%)
BOP 9.87 Increased By ▲ 0.23 (2.39%)
CNERGY 7.67 Increased By ▲ 0.14 (1.86%)
FCCL 37.86 Increased By ▲ 0.16 (0.42%)
FFL 15.76 Increased By ▲ 0.16 (1.03%)
FLYNG 25.31 Decreased By ▼ -0.28 (-1.09%)
HUBC 130.17 Increased By ▲ 3.10 (2.44%)
HUMNL 13.59 Increased By ▲ 0.09 (0.67%)
KEL 4.67 Increased By ▲ 0.09 (1.97%)
KOSM 6.21 Increased By ▲ 0.11 (1.8%)
MLCF 44.29 Increased By ▲ 0.33 (0.75%)
OGDC 206.87 Increased By ▲ 3.63 (1.79%)
PACE 6.56 Increased By ▲ 0.16 (2.5%)
PAEL 40.55 Decreased By ▼ -0.43 (-1.05%)
PIAHCLA 17.59 Increased By ▲ 0.10 (0.57%)
PIBTL 8.07 Increased By ▲ 0.41 (5.35%)
POWER 9.24 Increased By ▲ 0.16 (1.76%)
PPL 178.56 Increased By ▲ 4.31 (2.47%)
PRL 39.08 Increased By ▲ 1.01 (2.65%)
PTC 24.14 Increased By ▲ 0.07 (0.29%)
SEARL 107.85 Increased By ▲ 0.61 (0.57%)
SILK 0.97 No Change ▼ 0.00 (0%)
SSGC 39.11 Increased By ▲ 2.71 (7.45%)
SYM 19.12 Increased By ▲ 0.08 (0.42%)
TELE 8.60 Increased By ▲ 0.36 (4.37%)
TPLP 12.37 Increased By ▲ 0.59 (5.01%)
TRG 66.01 Increased By ▲ 1.13 (1.74%)
WAVESAPP 12.78 Increased By ▲ 1.15 (9.89%)
WTL 1.70 Increased By ▲ 0.02 (1.19%)
YOUW 3.95 Increased By ▲ 0.10 (2.6%)
BR100 11,930 Increased By 162.4 (1.38%)
BR30 35,660 Increased By 695.9 (1.99%)
KSE100 113,206 Increased By 1719 (1.54%)
KSE30 35,565 Increased By 630.8 (1.81%)

Sindh Governor Dr Ishratul Ibad on Tuesday said that all ongoing development projects in Sindh would be completed within two years. The governor was talking to journalists after laying foundation of a bridge on Malir River in Shah Faisal Colony. The bridge would connect Shah Faisal Colony with Korangi.
He said that the ongoing development projects were being completed on fast pace and there was no reason for any delay in the work. "These would be completed within two years," he said.
He said that the new bridge would cost Rs 1,005 million. It is estimated that completion of work would take about 22 months.
The construction of bridge was a longstanding demand of the people of Shah Faisal Colony and Korangi. It would cut short travelling time and facilitate smooth flow of vehicular traffic.
Ibad said that the city was in need of many such bridges as major city areas were without link roads and alternative routes to travel from one locality to another.
He said that some more areas had been identified and soon there more bridges would be constructed.
The governor said that Karachi Circular Railway would be expanded. "The government is considering participation of private entrepreneurs to make circular railway attractive for private investment."
Later, the governor laid the foundation of Shahrae Darul Uloom at Daud Chowrangi, Korangi. The road would cost Rs 1,002 million.

Copyright Business Recorder, 2005

Comments

Comments are closed.