AGL 38.99 Decreased By ▼ -0.59 (-1.49%)
AIRLINK 130.15 Decreased By ▼ -1.07 (-0.82%)
BOP 7.18 Increased By ▲ 0.37 (5.43%)
CNERGY 4.64 Decreased By ▼ -0.07 (-1.49%)
DCL 8.45 Increased By ▲ 0.01 (0.12%)
DFML 41.05 Decreased By ▼ -0.42 (-1.01%)
DGKC 81.60 Decreased By ▼ -0.49 (-0.6%)
FCCL 32.75 Decreased By ▼ -0.35 (-1.06%)
FFBL 72.32 Decreased By ▼ -0.55 (-0.75%)
FFL 12.35 Increased By ▲ 0.09 (0.73%)
HUBC 109.80 Decreased By ▼ -0.94 (-0.85%)
HUMNL 14.10 Decreased By ▼ -0.41 (-2.83%)
KEL 5.10 Decreased By ▼ -0.09 (-1.73%)
KOSM 7.66 Increased By ▲ 0.05 (0.66%)
MLCF 38.60 Decreased By ▼ -0.30 (-0.77%)
NBP 68.61 Increased By ▲ 4.60 (7.19%)
OGDC 189.45 Decreased By ▼ -3.37 (-1.75%)
PAEL 25.50 Decreased By ▼ -0.18 (-0.7%)
PIBTL 7.45 Increased By ▲ 0.11 (1.5%)
PPL 151.55 Decreased By ▼ -2.52 (-1.64%)
PRL 25.41 Decreased By ▼ -0.42 (-1.63%)
PTC 17.39 Decreased By ▼ -0.42 (-2.36%)
SEARL 81.06 Decreased By ▼ -1.24 (-1.51%)
TELE 7.61 Decreased By ▼ -0.15 (-1.93%)
TOMCL 33.00 Decreased By ▼ -0.46 (-1.37%)
TPLP 8.38 Decreased By ▼ -0.11 (-1.3%)
TREET 16.95 Increased By ▲ 0.33 (1.99%)
TRG 57.70 Increased By ▲ 0.30 (0.52%)
UNITY 28.10 Increased By ▲ 0.59 (2.14%)
WTL 1.34 Decreased By ▼ -0.03 (-2.19%)
BR100 10,561 Increased By 56.7 (0.54%)
BR30 31,061 Decreased By -165.4 (-0.53%)
KSE100 98,749 Increased By 668.7 (0.68%)
KSE30 30,796 Increased By 236.8 (0.77%)

The President Pervez Musharraf's Taamir-e-Karachi Programme will give a new look to sprawling city of Karachi. One of the mega projects of T.K.P. is in progress at a satisfactory pace under W & S Department C.D.G.K; bridge over Malir River connecting Shah Faisal Colony and Korangi is a marvellous project of T.K.P. It is a 1350-metre long bridge joining Shah Faisal Colony to Korangi.
It has two wonderful approach roads; one is 625-metre long from Shama Centre to Shah Faisal Colony P.S. upto the main bridge, and the other measures 2898 metres from Singer Chowrangi, K.I.A. Road 8000.
It runs though Awami Colony and Gulshan-e-Millat, Korangi Road 13000 and links with Malir River Bund No 2. The total cost of this bridge is Rs 1 132.894 million and it will be completed within 730 days.
This bridge will open a new horizon of progress, not only for Landhi and Korangi, but also for North Karachi and beyond. It will save millions of rupees spent on fuel and help in conserving physical and mental energy.
It will increase the output of the industrial zones of Landhi and Korangi. We hope that this project will be completed well before the estimated time, ie 1-6-2007.

Copyright Business Recorder, 2005

Comments

Comments are closed.