AGL 38.75 Decreased By ▼ -0.83 (-2.1%)
AIRLINK 129.50 Decreased By ▼ -1.72 (-1.31%)
BOP 7.15 Increased By ▲ 0.34 (4.99%)
CNERGY 4.63 Decreased By ▼ -0.08 (-1.7%)
DCL 8.42 Decreased By ▼ -0.02 (-0.24%)
DFML 40.91 Decreased By ▼ -0.56 (-1.35%)
DGKC 81.30 Decreased By ▼ -0.79 (-0.96%)
FCCL 32.75 Decreased By ▼ -0.35 (-1.06%)
FFBL 72.31 Decreased By ▼ -0.56 (-0.77%)
FFL 12.40 Increased By ▲ 0.14 (1.14%)
HUBC 109.30 Decreased By ▼ -1.44 (-1.3%)
HUMNL 14.03 Decreased By ▼ -0.48 (-3.31%)
KEL 5.08 Decreased By ▼ -0.11 (-2.12%)
KOSM 7.60 Decreased By ▼ -0.01 (-0.13%)
MLCF 38.35 Decreased By ▼ -0.55 (-1.41%)
NBP 69.10 Increased By ▲ 5.09 (7.95%)
OGDC 188.95 Decreased By ▼ -3.87 (-2.01%)
PAEL 25.48 Decreased By ▼ -0.20 (-0.78%)
PIBTL 7.44 Increased By ▲ 0.10 (1.36%)
PPL 150.00 Decreased By ▼ -4.07 (-2.64%)
PRL 25.38 Decreased By ▼ -0.45 (-1.74%)
PTC 17.25 Decreased By ▼ -0.56 (-3.14%)
SEARL 80.70 Decreased By ▼ -1.60 (-1.94%)
TELE 7.59 Decreased By ▼ -0.17 (-2.19%)
TOMCL 32.97 Decreased By ▼ -0.49 (-1.46%)
TPLP 8.33 Decreased By ▼ -0.16 (-1.88%)
TREET 16.91 Increased By ▲ 0.29 (1.74%)
TRG 57.50 Increased By ▲ 0.10 (0.17%)
UNITY 28.00 Increased By ▲ 0.49 (1.78%)
WTL 1.34 Decreased By ▼ -0.03 (-2.19%)
BR100 10,537 Increased By 32.2 (0.31%)
BR30 30,958 Decreased By -268.2 (-0.86%)
KSE100 98,399 Increased By 319 (0.33%)
KSE30 30,666 Increased By 107.2 (0.35%)

Federal Minister for Water and Power Liaquat Ali Jatoi has directed the Karachi Electric Supply Corporation (KESC) to improve the rehabilitation and distribution system for uninterrupted power supply to the consumers in the summer season.
He said this while presiding over a meeting with KESC Managing Director and senior officials of Wapda and the Ministry to review the current power situation in Karachi here on Tuesday.
Jatoi directed KESC to prepare immediate plan for implementing generation projects on fast track basis. He also asked KESC to complete the Hubco-KESC transmission link for smooth and reliable supply of electricity for consumers.
He directed Wapda to provide over and above 600 MW power to KESC if surplus power was available in the system and provide full assistance an emergency situation to KESC.
He said Karachi was an important city and the hub of economic activities in the country, adding the electricity problem in Karachi was a matter of common interest and the government would provide all assistance to KESC to overcome the energy crisis there.
KESC MD Frank Schremidt briefed the meeting regarding major reasons of loadshedding in Karachi and informed that the commissioning of Hubco-KESC Line was delayed as KESC could not give shut down earlier.
The redistribution of load by KESC after shut down of Baldia Grid Station, resulted overburdened of its system which resulted in some 220 Kv line tripping.
KESC has its own generation capacity of 1750 MW but is providing 1102 KW presently. KESC''s own 200 MW as one of its unit at Bin Qasim developed technical fault reduced generating capacity, it is still under maintenance, he added.

Copyright Associated Press of Pakistan, 2006

Comments

Comments are closed.