AIRLINK 191.00 Decreased By ▼ -5.65 (-2.87%)
BOP 10.15 Increased By ▲ 0.01 (0.1%)
CNERGY 6.75 Increased By ▲ 0.06 (0.9%)
FCCL 34.35 Increased By ▲ 1.33 (4.03%)
FFL 17.42 Increased By ▲ 0.77 (4.62%)
FLYNG 23.80 Increased By ▲ 1.35 (6.01%)
HUBC 126.30 Decreased By ▼ -0.99 (-0.78%)
HUMNL 13.80 Decreased By ▼ -0.10 (-0.72%)
KEL 4.75 Decreased By ▼ -0.01 (-0.21%)
KOSM 6.55 Increased By ▲ 0.18 (2.83%)
MLCF 43.35 Increased By ▲ 1.13 (2.68%)
OGDC 226.45 Increased By ▲ 13.42 (6.3%)
PACE 7.35 Increased By ▲ 0.34 (4.85%)
PAEL 41.96 Increased By ▲ 1.09 (2.67%)
PIAHCLA 17.24 Increased By ▲ 0.42 (2.5%)
PIBTL 8.45 Increased By ▲ 0.16 (1.93%)
POWER 9.05 Increased By ▲ 0.23 (2.61%)
PPL 194.30 Increased By ▲ 10.73 (5.85%)
PRL 37.50 Decreased By ▼ -0.77 (-2.01%)
PTC 24.05 Decreased By ▼ -0.02 (-0.08%)
SEARL 94.97 Decreased By ▼ -0.14 (-0.15%)
SILK 1.00 No Change ▼ 0.00 (0%)
SSGC 40.00 Decreased By ▼ -0.31 (-0.77%)
SYM 17.80 Decreased By ▼ -0.41 (-2.25%)
TELE 8.72 Decreased By ▼ -0.01 (-0.11%)
TPLP 12.46 Increased By ▲ 0.25 (2.05%)
TRG 62.74 Decreased By ▼ -1.62 (-2.52%)
WAVESAPP 10.35 Decreased By ▼ -0.09 (-0.86%)
WTL 1.73 Decreased By ▼ -0.06 (-3.35%)
YOUW 4.02 Increased By ▲ 0.02 (0.5%)
BR100 11,814 Increased By 90.4 (0.77%)
BR30 36,234 Increased By 874.6 (2.47%)
KSE100 113,247 Increased By 609 (0.54%)
KSE30 35,712 Increased By 253.6 (0.72%)

The work on linking of Hubco with KESC link was completed on Tuesday evening, paving the way for commencement of electric supply directly from Hibco powerhouse to Karachi, it was learnt here Wednesday.
The work on this Rs 3 billion project was taken in hand in 2004 to meet power shortage in Karachi through additional supplies directly from Hubco, which has the generation capacity for 1200 MW.
So far, KESC had been receiving additional power supply of up to 600 MW from Wapda's Jamshoro-KDA Grid. However, the two circuits of Jamshoro Grid have since grown old and at times there had been tripping during maximum supply periods, causing power blackout in Karachi.
The link, according to sources, is planned to be inaugurated on May 15. Thereafter Karachi is supposed to receive additional 510 MW from Hubco, directly, besides supply from Wapda through Jamshoro Grid, already supplying 600 MW.

Copyright Associated Press of Pakistan, 2006

Comments

Comments are closed.