AGL 40.01 Decreased By ▼ -0.20 (-0.5%)
AIRLINK 127.00 Decreased By ▼ -0.64 (-0.5%)
BOP 6.69 Increased By ▲ 0.02 (0.3%)
CNERGY 4.51 Increased By ▲ 0.06 (1.35%)
DCL 8.64 Decreased By ▼ -0.09 (-1.03%)
DFML 41.04 Decreased By ▼ -0.12 (-0.29%)
DGKC 85.61 Decreased By ▼ -0.50 (-0.58%)
FCCL 33.11 Increased By ▲ 0.55 (1.69%)
FFBL 66.10 Increased By ▲ 1.72 (2.67%)
FFL 11.55 Decreased By ▼ -0.06 (-0.52%)
HUBC 111.11 Decreased By ▼ -1.35 (-1.2%)
HUMNL 14.82 Increased By ▲ 0.01 (0.07%)
KEL 5.17 Increased By ▲ 0.13 (2.58%)
KOSM 7.66 Increased By ▲ 0.30 (4.08%)
MLCF 40.21 Decreased By ▼ -0.12 (-0.3%)
NBP 60.51 Decreased By ▼ -0.57 (-0.93%)
OGDC 194.10 Decreased By ▼ -0.08 (-0.04%)
PAEL 26.72 Decreased By ▼ -0.19 (-0.71%)
PIBTL 7.37 Increased By ▲ 0.09 (1.24%)
PPL 153.79 Increased By ▲ 1.11 (0.73%)
PRL 26.21 Decreased By ▼ -0.01 (-0.04%)
PTC 17.18 Increased By ▲ 1.04 (6.44%)
SEARL 85.60 Decreased By ▼ -0.10 (-0.12%)
TELE 7.57 Decreased By ▼ -0.10 (-1.3%)
TOMCL 34.39 Decreased By ▼ -2.08 (-5.7%)
TPLP 8.82 Increased By ▲ 0.03 (0.34%)
TREET 16.82 Decreased By ▼ -0.02 (-0.12%)
TRG 62.55 Decreased By ▼ -0.19 (-0.3%)
UNITY 27.29 Decreased By ▼ -0.91 (-3.23%)
WTL 1.30 Decreased By ▼ -0.04 (-2.99%)
BR100 10,112 Increased By 26 (0.26%)
BR30 31,188 Increased By 17.5 (0.06%)
KSE100 94,996 Increased By 232 (0.24%)
KSE30 29,481 Increased By 71 (0.24%)
Pakistan

Nepra developing upfront tariff for biomass-based power projects

%D%AMUSHTAQ GHUMMAN %D%AISLAMABAD: National Electric Power Regulatory Authority (Nepra) through its suo motu powers has decided to develop upfront tariff for biomass-based power projects.
Published February 24, 2017

image

MUSHTAQ GHUMMAN

ISLAMABAD: National Electric Power Regulatory Authority (Nepra) through its suo motu powers has decided to develop upfront tariff for biomass-based power projects.

For this purpose, the regulator has prepared a proposal for the stakeholders, according to which tariff for 1-10 years has been proposed at Rs7.2781 per unit, 11-30 years Rs5.7477 per unit, levelized tariff, Rs6.9819 per unit whereas the proposed tariff for 16-60 years is Rs6.7435 per unit and levelized tariff at Rs6.6758 per unit.

The generation tariff assumptions are as follows: (i) project cost has been assumed as US$ 0.8 million per MW; (ii) annual plant factor has been assumed as 80%; (iii) insurance has been assumed as 1% of EPC cost; (iv) the debt equity structure of 75:25; (v) IRR of 15%; (vi) Kibor of 6.53%; (vii) spread over Kibor as 3%; (viii) exchange rate parity of Rs 105/$; (ix) debt repayment period of 10 years, 15 years and WACC (11.33%) for 30 years; (x) efficiency of 29.24% (flat) Calorific Value of 12364.74 average of all biomass agricultural residue; and (xi) fuel price of Rs 5,000/ton, including freight. The power projects can use agricultural residue, i.e., cotton stalk, wheat stalk, rice straw, rice husk, maize straw, maize husk, maize cob, wood, etc, for electricity generation.

According to Nepra, the proposed costs and assumptions may vary (upward/downward) based on the information/data received from the stakeholders during the proceedings.

Nepra has also asked interested persons who desire to participate in the proceedings to file an intervention request within 15 days from the date of publication of this notice. Such intervention request should state the name and address of the person filing the same, objections and the manner in which such person is likely to be substantially and specifically affected by any determination in the proceedings. The intervention request may also contain the contentions of the person making the same, the relief sought and the evidence, if any, in support of the case.

Copyright Business Recorder, 2017

Comments

Comments are closed.