AGL 40.25 Increased By ▲ 0.22 (0.55%)
AIRLINK 127.80 Increased By ▲ 0.10 (0.08%)
BOP 6.73 Increased By ▲ 0.12 (1.82%)
CNERGY 4.50 Decreased By ▼ -0.10 (-2.17%)
DCL 8.94 Increased By ▲ 0.15 (1.71%)
DFML 41.59 Increased By ▲ 0.01 (0.02%)
DGKC 86.60 Increased By ▲ 0.81 (0.94%)
FCCL 32.65 Increased By ▲ 0.16 (0.49%)
FFBL 65.05 Increased By ▲ 1.02 (1.59%)
FFL 11.61 Increased By ▲ 1.06 (10.05%)
HUBC 113.70 Increased By ▲ 2.93 (2.65%)
HUMNL 14.80 Decreased By ▼ -0.27 (-1.79%)
KEL 5.04 Increased By ▲ 0.16 (3.28%)
KOSM 7.32 Decreased By ▼ -0.13 (-1.74%)
MLCF 40.50 Decreased By ▼ -0.02 (-0.05%)
NBP 61.53 Increased By ▲ 0.48 (0.79%)
OGDC 196.71 Increased By ▲ 1.84 (0.94%)
PAEL 27.47 Decreased By ▼ -0.04 (-0.15%)
PIBTL 7.34 Decreased By ▼ -0.47 (-6.02%)
PPL 154.90 Increased By ▲ 2.37 (1.55%)
PRL 26.41 Decreased By ▼ -0.17 (-0.64%)
PTC 16.25 Decreased By ▼ -0.01 (-0.06%)
SEARL 86.10 Increased By ▲ 1.96 (2.33%)
TELE 7.75 Decreased By ▼ -0.21 (-2.64%)
TOMCL 36.40 Decreased By ▼ -0.20 (-0.55%)
TPLP 8.88 Increased By ▲ 0.22 (2.54%)
TREET 16.67 Decreased By ▼ -0.99 (-5.61%)
TRG 62.79 Increased By ▲ 4.17 (7.11%)
UNITY 28.50 Increased By ▲ 1.64 (6.11%)
WTL 1.35 Decreased By ▼ -0.03 (-2.17%)
BR100 10,135 Increased By 135.3 (1.35%)
BR30 31,454 Increased By 451.5 (1.46%)
KSE100 95,144 Increased By 952.2 (1.01%)
KSE30 29,560 Increased By 358.8 (1.23%)

Foreign investment of up to 25 billion dollars is expected in the Punjab province, which will ensure economic growth, promote local industry and create jobs for thousands of people. This was told by Punjab Minister for Public Health Engineering (PHE), Hasan Akhtar Mokal while talking to APP.
He said that there had been a 120 percent increase in trade with China. He said that the Punjab government was providing health facilities, including provision of clean drinking water, to the masses at grassroots level.
As many as 1,000 water schemes costing rupees five billion were being completed in the province, including water treatment plants and testing laboratories were being established.
Through another project, old and eroded pipelines for drinking water, and for sewerage system, were being replaced. The work would be completed by the end of this year, he said.

Copyright Associated Press of Pakistan, 2007

Comments

Comments are closed.