AIRLINK 208.79 Increased By ▲ 8.50 (4.24%)
BOP 10.40 Decreased By ▼ -0.09 (-0.86%)
CNERGY 7.18 Decreased By ▼ -0.03 (-0.42%)
FCCL 35.05 Increased By ▲ 0.11 (0.31%)
FFL 17.41 Decreased By ▼ -0.01 (-0.06%)
FLYNG 25.35 Increased By ▲ 0.50 (2.01%)
HUBC 129.25 Increased By ▲ 1.44 (1.13%)
HUMNL 14.40 Increased By ▲ 0.59 (4.27%)
KEL 5.00 No Change ▼ 0.00 (0%)
KOSM 6.95 Decreased By ▼ -0.08 (-1.14%)
MLCF 45.09 Increased By ▲ 0.47 (1.05%)
OGDC 222.05 Decreased By ▼ -0.10 (-0.05%)
PACE 7.23 Decreased By ▼ -0.19 (-2.56%)
PAEL 43.00 Increased By ▲ 0.20 (0.47%)
PIAHCLA 17.30 Decreased By ▼ -0.09 (-0.52%)
PIBTL 8.55 Increased By ▲ 0.04 (0.47%)
POWER 9.13 Decreased By ▼ -0.02 (-0.22%)
PPL 192.00 Decreased By ▼ -0.73 (-0.38%)
PRL 43.80 Increased By ▲ 2.30 (5.54%)
PTC 25.35 Increased By ▲ 0.91 (3.72%)
SEARL 104.50 Increased By ▲ 3.23 (3.19%)
SILK 1.02 Decreased By ▼ -0.03 (-2.86%)
SSGC 43.41 Decreased By ▼ -0.46 (-1.05%)
SYM 18.61 Decreased By ▼ -0.15 (-0.8%)
TELE 9.38 Decreased By ▼ -0.16 (-1.68%)
TPLP 13.25 Increased By ▲ 0.17 (1.3%)
TRG 70.60 Increased By ▲ 4.41 (6.66%)
WAVESAPP 10.55 Increased By ▲ 0.02 (0.19%)
WTL 1.78 No Change ▼ 0.00 (0%)
YOUW 4.02 Decreased By ▼ -0.02 (-0.5%)
BR100 12,105 Increased By 65.6 (0.54%)
BR30 37,056 Increased By 367.7 (1%)
KSE100 115,150 Increased By 345.5 (0.3%)
KSE30 36,133 Increased By 30.7 (0.08%)

Sindh Governor, Dr Ishratul Ibad Khan has called upon the KESC to carry out its short and long term plans, particularly with reference to power generation programme, on a fast track basis.
"The problems in next summer must be lesser than the ones faced this summer" he emphasised and added that work being done on all the projects must be visible to people. He was addressing a meeting held at Governor House here on Saturday in which various power generation issues of the corporation came under consideration.
Those attending the meeting included Chief Secretary Shakil Durrani, Principal Secretary Saleem Khan and others besides John Kim, CEO of a South Korean Engineering Company. John Kim while showing interest in the setting up of a power generation plant in Karachi said that he wants to make investment on BOT basis to set up a 1,000 MW plant.
He informed that the company could supply 47 MW furnace oil operated plants in 11 months, which can be installed immediately. The governor directed that installation of these plants in industrial units should be considered. He asked the corporation to sort out details with the Korean company at the earliest. The chief secretary informed the meeting that provinces, too, could generate energy.

Copyright Associated Press of Pakistan, 2007

Comments

Comments are closed.