AGL 40.00 No Change ▼ 0.00 (0%)
AIRLINK 129.00 Decreased By ▼ -0.53 (-0.41%)
BOP 6.76 Increased By ▲ 0.08 (1.2%)
CNERGY 4.50 Decreased By ▼ -0.13 (-2.81%)
DCL 8.70 Decreased By ▼ -0.24 (-2.68%)
DFML 41.00 Decreased By ▼ -0.69 (-1.66%)
DGKC 81.30 Decreased By ▼ -2.47 (-2.95%)
FCCL 32.68 Decreased By ▼ -0.09 (-0.27%)
FFBL 74.25 Decreased By ▼ -1.22 (-1.62%)
FFL 11.75 Increased By ▲ 0.28 (2.44%)
HUBC 110.03 Decreased By ▼ -0.52 (-0.47%)
HUMNL 13.80 Decreased By ▼ -0.76 (-5.22%)
KEL 5.29 Decreased By ▼ -0.10 (-1.86%)
KOSM 7.63 Decreased By ▼ -0.77 (-9.17%)
MLCF 38.35 Decreased By ▼ -1.44 (-3.62%)
NBP 63.70 Increased By ▲ 3.41 (5.66%)
OGDC 194.88 Decreased By ▼ -4.78 (-2.39%)
PAEL 25.75 Decreased By ▼ -0.90 (-3.38%)
PIBTL 7.37 Decreased By ▼ -0.29 (-3.79%)
PPL 155.74 Decreased By ▼ -2.18 (-1.38%)
PRL 25.70 Decreased By ▼ -1.03 (-3.85%)
PTC 17.56 Decreased By ▼ -0.90 (-4.88%)
SEARL 78.71 Decreased By ▼ -3.73 (-4.52%)
TELE 7.88 Decreased By ▼ -0.43 (-5.17%)
TOMCL 33.61 Decreased By ▼ -0.90 (-2.61%)
TPLP 8.41 Decreased By ▼ -0.65 (-7.17%)
TREET 16.26 Decreased By ▼ -1.21 (-6.93%)
TRG 58.60 Decreased By ▼ -2.72 (-4.44%)
UNITY 27.51 Increased By ▲ 0.08 (0.29%)
WTL 1.41 Increased By ▲ 0.03 (2.17%)
BR100 10,450 Increased By 43.4 (0.42%)
BR30 31,209 Decreased By -504.2 (-1.59%)
KSE100 97,798 Increased By 469.8 (0.48%)
KSE30 30,481 Increased By 288.3 (0.95%)

The work of laying 36- and 48-inch 19 km long water pipeline for carrying additional 6 million gallons per day (mgd) water has been started at a cost of Rs 387.2 million for 24-hour supply to Baldia Town.
The Baldia Town is an area, which is faced with water shortage for the last 30 years for its being at the tail-end, and Karachi Nazim Mustafa Kamal has directed laying of this pipeline for additional water supply to the area. The KWSB Additional Vice-Chairman and MPA Mohammed Moin Khan, inspected the pipe laying work on Saturday.
On the occasion, he was informed that the pipeline has been so designed that there would be no chance of taking out illegal connection. This water main will emerge from Hub reservoir and would run through Northern Bypass to Baldia Town. It will be laid with the use of 12,000 metres mild steel pipes of 48-inch dia(meter) and 7000 metres prestressed concrete 36-inch dia pipes.
The AVC directed the engineers to complete the work on a fast track, maintaining quality of work. He called for ensuring regular supply of pipes from City government's pipe factory and said shortage of pipes should not occur. For this project, he said, mild steel and prestressed pipes have been selected which have 100-year physical age.

Copyright Associated Press of Pakistan, 2007

Comments

Comments are closed.