AGL 38.14 Increased By ▲ 0.12 (0.32%)
AIRLINK 214.51 Increased By ▲ 17.15 (8.69%)
BOP 9.85 Increased By ▲ 0.31 (3.25%)
CNERGY 6.85 Increased By ▲ 0.94 (15.91%)
DCL 9.11 Increased By ▲ 0.29 (3.29%)
DFML 38.60 Increased By ▲ 2.86 (8%)
DGKC 100.40 Increased By ▲ 3.54 (3.65%)
FCCL 36.59 Increased By ▲ 1.34 (3.8%)
FFBL 88.94 Increased By ▲ 6.64 (8.07%)
FFL 14.49 Increased By ▲ 1.32 (10.02%)
HUBC 134.01 Increased By ▲ 6.46 (5.06%)
HUMNL 13.69 Increased By ▲ 0.19 (1.41%)
KEL 5.70 Increased By ▲ 0.38 (7.14%)
KOSM 7.28 Increased By ▲ 0.28 (4%)
MLCF 45.85 Increased By ▲ 1.15 (2.57%)
NBP 61.70 Increased By ▲ 0.28 (0.46%)
OGDC 232.80 Increased By ▲ 18.13 (8.45%)
PAEL 40.75 Increased By ▲ 1.96 (5.05%)
PIBTL 8.59 Increased By ▲ 0.34 (4.12%)
PPL 203.50 Increased By ▲ 10.42 (5.4%)
PRL 40.39 Increased By ▲ 1.73 (4.47%)
PTC 28.26 Increased By ▲ 2.46 (9.53%)
SEARL 109.00 Increased By ▲ 5.40 (5.21%)
TELE 8.73 Increased By ▲ 0.43 (5.18%)
TOMCL 36.00 Increased By ▲ 1.00 (2.86%)
TPLP 13.90 Increased By ▲ 0.60 (4.51%)
TREET 24.38 Increased By ▲ 2.22 (10.02%)
TRG 61.15 Increased By ▲ 5.56 (10%)
UNITY 34.76 Increased By ▲ 1.79 (5.43%)
WTL 1.72 Increased By ▲ 0.12 (7.5%)
BR100 12,263 Increased By 536.8 (4.58%)
BR30 38,435 Increased By 2058.7 (5.66%)
KSE100 114,070 Increased By 4557.1 (4.16%)
KSE30 36,085 Increased By 1571.5 (4.55%)

The work of laying 36- and 48-inch 19 km long water pipeline for carrying additional 6 million gallons per day (mgd) water has been started at a cost of Rs 387.2 million for 24-hour supply to Baldia Town.
The Baldia Town is an area, which is faced with water shortage for the last 30 years for its being at the tail-end, and Karachi Nazim Mustafa Kamal has directed laying of this pipeline for additional water supply to the area. The KWSB Additional Vice-Chairman and MPA Mohammed Moin Khan, inspected the pipe laying work on Saturday.
On the occasion, he was informed that the pipeline has been so designed that there would be no chance of taking out illegal connection. This water main will emerge from Hub reservoir and would run through Northern Bypass to Baldia Town. It will be laid with the use of 12,000 metres mild steel pipes of 48-inch dia(meter) and 7000 metres prestressed concrete 36-inch dia pipes.
The AVC directed the engineers to complete the work on a fast track, maintaining quality of work. He called for ensuring regular supply of pipes from City government's pipe factory and said shortage of pipes should not occur. For this project, he said, mild steel and prestressed pipes have been selected which have 100-year physical age.

Copyright Associated Press of Pakistan, 2007

Comments

Comments are closed.