AIRLINK 217.98 Decreased By ▼ -4.91 (-2.2%)
BOP 10.93 Increased By ▲ 0.11 (1.02%)
CNERGY 7.55 Decreased By ▼ -0.01 (-0.13%)
FCCL 34.83 Decreased By ▼ -2.24 (-6.04%)
FFL 19.32 Increased By ▲ 0.08 (0.42%)
FLYNG 25.15 Decreased By ▼ -1.89 (-6.99%)
HUBC 131.09 Decreased By ▼ -1.55 (-1.17%)
HUMNL 14.56 Decreased By ▼ -0.17 (-1.15%)
KEL 5.18 Decreased By ▼ -0.22 (-4.07%)
KOSM 7.36 Decreased By ▼ -0.12 (-1.6%)
MLCF 45.63 Decreased By ▼ -2.55 (-5.29%)
OGDC 222.08 Decreased By ▼ -1.18 (-0.53%)
PACE 8.16 Decreased By ▼ -0.02 (-0.24%)
PAEL 44.19 Increased By ▲ 0.69 (1.59%)
PIAHCLA 17.69 Decreased By ▼ -0.37 (-2.05%)
PIBTL 8.97 Decreased By ▼ -0.10 (-1.1%)
POWERPS 12.51 Decreased By ▼ -0.50 (-3.84%)
PPL 193.01 Decreased By ▼ -5.23 (-2.64%)
PRL 43.17 Increased By ▲ 0.93 (2.2%)
PTC 26.63 Decreased By ▼ -0.76 (-2.77%)
SEARL 107.08 Decreased By ▼ -3.00 (-2.73%)
SILK 1.04 Decreased By ▼ -0.02 (-1.89%)
SSGC 45.00 Decreased By ▼ -2.30 (-4.86%)
SYM 21.19 Increased By ▲ 0.42 (2.02%)
TELE 10.15 Decreased By ▼ -0.37 (-3.52%)
TPLP 14.51 Decreased By ▼ -0.44 (-2.94%)
TRG 67.28 Decreased By ▼ -1.57 (-2.28%)
WAVESAPP 11.29 Decreased By ▼ -0.63 (-5.29%)
WTL 1.70 Decreased By ▼ -0.09 (-5.03%)
YOUW 4.25 Decreased By ▼ -0.10 (-2.3%)
BR100 12,397 Increased By 33.3 (0.27%)
BR30 37,347 Decreased By -871.2 (-2.28%)
KSE100 117,587 Increased By 467.3 (0.4%)
KSE30 37,065 Increased By 128 (0.35%)

In their report to the shareholders for the period July-September 2007, the Directors of KESC had said and I quote: "Contract for new power plant - Phase-1 of 220 MW has already been awarded and first Gas Turbine (GT) of 48 MW, is likely to be commissioned in November 07.
Bid evaluation process with respect to setting up of 560 MW power plant - phase-II at BQPS is in final stage and contract is likely to be awarded in the near future".
It is important that KESC keeps to its promise and people of Karachi are spared this summer, the horrendous loadshedding of last year. It is regretted that that there is no word from KESC about the first Gas Turbine of 48 MW though half a month has passed since end November.
A briefing by its Directors (reported on 8 December 07) on KESC's progress on system improvement failed to mention anything about the progress on the promised generation capacity enhancement. The least KESC can do is to keep its clients (which means practically every one in Karachi) fully informed about matters in its domain, which deeply concern them.

Copyright Business Recorder, 2007

Comments

Comments are closed.