AGL 40.00 No Change ▼ 0.00 (0%)
AIRLINK 129.06 Decreased By ▼ -0.47 (-0.36%)
BOP 6.75 Increased By ▲ 0.07 (1.05%)
CNERGY 4.49 Decreased By ▼ -0.14 (-3.02%)
DCL 8.55 Decreased By ▼ -0.39 (-4.36%)
DFML 40.82 Decreased By ▼ -0.87 (-2.09%)
DGKC 80.96 Decreased By ▼ -2.81 (-3.35%)
FCCL 32.77 No Change ▼ 0.00 (0%)
FFBL 74.43 Decreased By ▼ -1.04 (-1.38%)
FFL 11.74 Increased By ▲ 0.27 (2.35%)
HUBC 109.58 Decreased By ▼ -0.97 (-0.88%)
HUMNL 13.75 Decreased By ▼ -0.81 (-5.56%)
KEL 5.31 Decreased By ▼ -0.08 (-1.48%)
KOSM 7.72 Decreased By ▼ -0.68 (-8.1%)
MLCF 38.60 Decreased By ▼ -1.19 (-2.99%)
NBP 63.51 Increased By ▲ 3.22 (5.34%)
OGDC 194.69 Decreased By ▼ -4.97 (-2.49%)
PAEL 25.71 Decreased By ▼ -0.94 (-3.53%)
PIBTL 7.39 Decreased By ▼ -0.27 (-3.52%)
PPL 155.45 Decreased By ▼ -2.47 (-1.56%)
PRL 25.79 Decreased By ▼ -0.94 (-3.52%)
PTC 17.50 Decreased By ▼ -0.96 (-5.2%)
SEARL 78.65 Decreased By ▼ -3.79 (-4.6%)
TELE 7.86 Decreased By ▼ -0.45 (-5.42%)
TOMCL 33.73 Decreased By ▼ -0.78 (-2.26%)
TPLP 8.40 Decreased By ▼ -0.66 (-7.28%)
TREET 16.27 Decreased By ▼ -1.20 (-6.87%)
TRG 58.22 Decreased By ▼ -3.10 (-5.06%)
UNITY 27.49 Increased By ▲ 0.06 (0.22%)
WTL 1.39 Increased By ▲ 0.01 (0.72%)
BR100 10,445 Increased By 38.5 (0.37%)
BR30 31,189 Decreased By -523.9 (-1.65%)
KSE100 97,798 Increased By 469.8 (0.48%)
KSE30 30,481 Increased By 288.3 (0.95%)

The US space agency said it has once again delayed the launch of the US space shuttle Atlantis that is to carry a European space laboratory to the International Space Station. No new launch date has been set. Faulty fuel gauges on the spacecraft's liquid hydrogen tank has already forced several postponements of the launch that was initially scheduled for December 6.
Until Thursday, the target launch date was January 10. But the National Aeronautics and Space Administration said in a statement that even that date was "no longer achievable." The conclusion came after managers of the shuttle program met Thursday to assess the progress made in efforts to find a solution to the sensor problem.
"Instrumentation installed for the tanking test indicate that there are one or more intermittent open circuits in the area of the feed through connector on the external tank's liquid hydrogen tank," the statement said. The agency said the external parts of the connector will be removed and replaced with others to ensure better connectivity. "This work will take some time to properly accomplish and to certify the redesigned configuration before flight," NASA said. "The program will take time to assess progress of the work before setting a target launch date."
The Atlantis crew of seven is preparing for an 11-day mission to fly the European Columbus laboratory to the space station. Until now, only the United States and Russia have had their own laboratories at the ISS. The crew includes two European Space Agency astronauts - Hans Schlegel of Germany and Frenchman Leopold Eyharts. Eyharts was scheduled to stay on the ISS for two and a half months to prepare Columbus for future scientific work.

Copyright Agence France-Presse, 2007

Comments

Comments are closed.