AGL 34.48 Decreased By ▼ -0.72 (-2.05%)
AIRLINK 132.50 Increased By ▲ 9.27 (7.52%)
BOP 5.16 Increased By ▲ 0.12 (2.38%)
CNERGY 3.83 Decreased By ▼ -0.08 (-2.05%)
DCL 8.10 Decreased By ▼ -0.05 (-0.61%)
DFML 45.30 Increased By ▲ 1.08 (2.44%)
DGKC 75.90 Increased By ▲ 1.55 (2.08%)
FCCL 24.85 Increased By ▲ 0.38 (1.55%)
FFBL 44.18 Decreased By ▼ -4.02 (-8.34%)
FFL 8.80 Increased By ▲ 0.02 (0.23%)
HUBC 144.00 Decreased By ▼ -1.85 (-1.27%)
HUMNL 10.52 Decreased By ▼ -0.33 (-3.04%)
KEL 4.00 No Change ▼ 0.00 (0%)
KOSM 7.74 Decreased By ▼ -0.26 (-3.25%)
MLCF 33.25 Increased By ▲ 0.45 (1.37%)
NBP 56.50 Decreased By ▼ -0.65 (-1.14%)
OGDC 141.00 Decreased By ▼ -4.35 (-2.99%)
PAEL 25.70 Decreased By ▼ -0.05 (-0.19%)
PIBTL 5.74 Decreased By ▼ -0.02 (-0.35%)
PPL 112.74 Decreased By ▼ -4.06 (-3.48%)
PRL 24.08 Increased By ▲ 0.08 (0.33%)
PTC 11.19 Increased By ▲ 0.14 (1.27%)
SEARL 58.50 Increased By ▲ 0.09 (0.15%)
TELE 7.42 Decreased By ▼ -0.07 (-0.93%)
TOMCL 41.00 Decreased By ▼ -0.10 (-0.24%)
TPLP 8.23 Decreased By ▼ -0.08 (-0.96%)
TREET 15.14 Decreased By ▼ -0.06 (-0.39%)
TRG 56.10 Increased By ▲ 0.90 (1.63%)
UNITY 27.70 Decreased By ▼ -0.15 (-0.54%)
WTL 1.31 Decreased By ▼ -0.03 (-2.24%)
BR100 8,605 Increased By 33.2 (0.39%)
BR30 26,904 Decreased By -371.6 (-1.36%)
KSE100 82,044 Increased By 584.4 (0.72%)
KSE30 26,012 Increased By 211.8 (0.82%)

The US Navy on Monday awarded a $14 billion contract to General Dynamics Corp and Northrop Grumman Corp for eight Virginia-class submarines, saying it had met a "nearly impossible" target of cutting the cost of each ship by $400 million.
The five-year contract calls for production of one submarine in 2009, one in 2010 and two submarines in each of the following three years, the Navy said, noting it would cut acquisition costs of the 2012 ships by about 20 percent. General Dynamics, based in Falls Church, Virginia, is the lead contractor for the nuclear-powered submarines, but shares construction equally with Los Angeles-based Northrop.
The Navy said it invested $600 million in more than 100 design changes to make the ship more efficient to produce and cut its build time to 60 months from 84 months. Overall, the effort will cut $4 billion from the overall submarine program. Rear Adm. William Hilarides, program executive officer for submarines, said the Navy had met a target set by then Chief of Naval Operations Adm. Mike Mullen, who said the Navy could order two submarines a year if it knocked the price of each by $400 million to $2 billion, in fiscal 2005 dollars. Mullen is now chairman of the Joint Chiefs of Staff.
The fixed-price contract signed by the Navy and the contractors achieved both goals, which had seemed "nearly impossible" at the time, Hilarides said. "It brings stability to the submarine program, to our work force and to the shipbuilding supplier industrial base for the next decade," Matt Mulherin, general manager of Northrop Grumman's shipyard in Newport News, Virginia, said in a statement. The vessels are designed for a range of missions such as anti-submarine and surface ship warfare, delivering special operation forces, intelligence and surveillance.
"By providing money over a period of several years, it becomes easier for the contractor to plan ahead and cut the cost of each vessel," said Loren Thompson, defence analyst with the Lexington Institute in Virginia. He said the multiyear contract would help reassure shipyard workers "that their jobs will exist five years from today." Hilarides said the contract affected 12,000 companies in 48 states, and would provide five years of stable work for tens of thousands of workers around the country.
General Dynamics does its submarine work at its Electric Boat shipyard in Groton, Connecticut, while Northrop does its submarine work at the Newport News shipyard in Virginia. John Casey, president of Electric Boat, said the contract would provide good jobs around the country, while ensuring the Navy had the capabilities it needed to maintain US "undersea superiority" into the century.

Copyright Reuters, 2008

Comments

Comments are closed.