AGL 40.02 Decreased By ▼ -0.01 (-0.02%)
AIRLINK 127.99 Increased By ▲ 0.29 (0.23%)
BOP 6.66 Increased By ▲ 0.05 (0.76%)
CNERGY 4.44 Decreased By ▼ -0.16 (-3.48%)
DCL 8.75 Decreased By ▼ -0.04 (-0.46%)
DFML 41.24 Decreased By ▼ -0.34 (-0.82%)
DGKC 86.18 Increased By ▲ 0.39 (0.45%)
FCCL 32.40 Decreased By ▼ -0.09 (-0.28%)
FFBL 64.89 Increased By ▲ 0.86 (1.34%)
FFL 11.61 Increased By ▲ 1.06 (10.05%)
HUBC 112.51 Increased By ▲ 1.74 (1.57%)
HUMNL 14.75 Decreased By ▼ -0.32 (-2.12%)
KEL 5.08 Increased By ▲ 0.20 (4.1%)
KOSM 7.38 Decreased By ▼ -0.07 (-0.94%)
MLCF 40.44 Decreased By ▼ -0.08 (-0.2%)
NBP 61.00 Decreased By ▼ -0.05 (-0.08%)
OGDC 193.60 Decreased By ▼ -1.27 (-0.65%)
PAEL 26.88 Decreased By ▼ -0.63 (-2.29%)
PIBTL 7.31 Decreased By ▼ -0.50 (-6.4%)
PPL 152.25 Decreased By ▼ -0.28 (-0.18%)
PRL 26.20 Decreased By ▼ -0.38 (-1.43%)
PTC 16.11 Decreased By ▼ -0.15 (-0.92%)
SEARL 85.50 Increased By ▲ 1.36 (1.62%)
TELE 7.70 Decreased By ▼ -0.26 (-3.27%)
TOMCL 36.95 Increased By ▲ 0.35 (0.96%)
TPLP 8.77 Increased By ▲ 0.11 (1.27%)
TREET 16.80 Decreased By ▼ -0.86 (-4.87%)
TRG 62.20 Increased By ▲ 3.58 (6.11%)
UNITY 28.07 Increased By ▲ 1.21 (4.5%)
WTL 1.32 Decreased By ▼ -0.06 (-4.35%)
BR100 10,081 Increased By 80.6 (0.81%)
BR30 31,142 Increased By 139.8 (0.45%)
KSE100 94,764 Increased By 571.8 (0.61%)
KSE30 29,410 Increased By 209 (0.72%)

BP said the cement seal on its crippled Gulf of Mexico oil well was holding on Friday, as the company readied a final push to permanently shut down the deepwater source of the world's worst offshore spill. More than 100 days after the start of the catastrophic spill that ravaged ecologically sensitive wetlands and lucrative coastal economies in the US Gulf, BP said no oil was leaking from the undersea Macondo well and no "recoverable oil" was left on the surface of the Gulf of Mexico.
BP finished pumping cement into the ruptured well on Thursday after injections of heavy drilling mud earlier this week subdued the upward pressure of oil and gas. The wellhead was provisionally capped in mid-July. The so-called "static kill" at the top of the well is due to be finished off with a "bottom kill" later in August with more mud and cement injected through a relief bore that will be drilled into the ruptured well shaft. This relief well is regarded as the final solution to plug the reservoir 13,000 feet (4,000 metres) beneath the seabed.
BP's chief operating officer for exploration and production, Doug Suttles, told reporters at a briefing in New Orleans the cement job "appears to be performing as expected," though tests were continuing on Friday. "All of the indications so far look very encouraging," he said. The well's sealing was a relief for both the British energy giant, whose shares and image have taken a beating from the spill, and for President Barack Obama's administration, which has pledged to help the pollution-struck Gulf Coast recover.

Copyright Reuters, 2010

Comments

Comments are closed.