AGL 40.21 Increased By ▲ 0.18 (0.45%)
AIRLINK 127.64 Decreased By ▼ -0.06 (-0.05%)
BOP 6.67 Increased By ▲ 0.06 (0.91%)
CNERGY 4.45 Decreased By ▼ -0.15 (-3.26%)
DCL 8.73 Decreased By ▼ -0.06 (-0.68%)
DFML 41.16 Decreased By ▼ -0.42 (-1.01%)
DGKC 86.11 Increased By ▲ 0.32 (0.37%)
FCCL 32.56 Increased By ▲ 0.07 (0.22%)
FFBL 64.38 Increased By ▲ 0.35 (0.55%)
FFL 11.61 Increased By ▲ 1.06 (10.05%)
HUBC 112.46 Increased By ▲ 1.69 (1.53%)
HUMNL 14.81 Decreased By ▼ -0.26 (-1.73%)
KEL 5.04 Increased By ▲ 0.16 (3.28%)
KOSM 7.36 Decreased By ▼ -0.09 (-1.21%)
MLCF 40.33 Decreased By ▼ -0.19 (-0.47%)
NBP 61.08 Increased By ▲ 0.03 (0.05%)
OGDC 194.18 Decreased By ▼ -0.69 (-0.35%)
PAEL 26.91 Decreased By ▼ -0.60 (-2.18%)
PIBTL 7.28 Decreased By ▼ -0.53 (-6.79%)
PPL 152.68 Increased By ▲ 0.15 (0.1%)
PRL 26.22 Decreased By ▼ -0.36 (-1.35%)
PTC 16.14 Decreased By ▼ -0.12 (-0.74%)
SEARL 85.70 Increased By ▲ 1.56 (1.85%)
TELE 7.67 Decreased By ▼ -0.29 (-3.64%)
TOMCL 36.47 Decreased By ▼ -0.13 (-0.36%)
TPLP 8.79 Increased By ▲ 0.13 (1.5%)
TREET 16.84 Decreased By ▼ -0.82 (-4.64%)
TRG 62.74 Increased By ▲ 4.12 (7.03%)
UNITY 28.20 Increased By ▲ 1.34 (4.99%)
WTL 1.34 Decreased By ▼ -0.04 (-2.9%)
BR100 10,086 Increased By 85.5 (0.85%)
BR30 31,170 Increased By 168.1 (0.54%)
KSE100 94,764 Increased By 571.8 (0.61%)
KSE30 29,410 Increased By 209 (0.72%)

Power shortage crossed the barrier of 5,000MW, ringing alarm bells among consumers, particularly industrial sector where supply was disconnected altogether by Friday afternoon. Meteorological department had predicted dry weather for at-least next 48 hours, which meant substantial rise in mercury that would pave way for pressure of electronic appliances on the system.
Textile industry, solely dependent on Pakistan Electric Power Company (Pepco) feeder, witnessed complete darkness by Friday evening and All Pakistan Textile Mills Association (Aptma) management sent an emergent communiqué to Pepco asking for relief.
Absence of fuel supply is being described as one of the prime reasons behind non-functional power plants. Pakistan State Oil is adamant to open oil supply to power plants only after payment of due bills. This situation is resulting into forced closures both in urban and rural areas where duration of power load shedding has crossed all limits.
According to Pepco sources, power generation stood at 9,465MW against a demand of 14,475MW, resulting into a shortfall of 5,010MW. Generation through hydel, thermal, IPPs and RPPs stood at 2,585MW, 1,396MW, 5,333MW and 151MW respectively. Power supply to KESC remained 650MW.

Copyright Business Recorder, 2011

Comments

Comments are closed.