AIRLINK 191.84 Decreased By ▼ -1.66 (-0.86%)
BOP 9.87 Increased By ▲ 0.23 (2.39%)
CNERGY 7.67 Increased By ▲ 0.14 (1.86%)
FCCL 37.86 Increased By ▲ 0.16 (0.42%)
FFL 15.76 Increased By ▲ 0.16 (1.03%)
FLYNG 25.31 Decreased By ▼ -0.28 (-1.09%)
HUBC 130.17 Increased By ▲ 3.10 (2.44%)
HUMNL 13.59 Increased By ▲ 0.09 (0.67%)
KEL 4.67 Increased By ▲ 0.09 (1.97%)
KOSM 6.21 Increased By ▲ 0.11 (1.8%)
MLCF 44.29 Increased By ▲ 0.33 (0.75%)
OGDC 206.87 Increased By ▲ 3.63 (1.79%)
PACE 6.56 Increased By ▲ 0.16 (2.5%)
PAEL 40.55 Decreased By ▼ -0.43 (-1.05%)
PIAHCLA 17.59 Increased By ▲ 0.10 (0.57%)
PIBTL 8.07 Increased By ▲ 0.41 (5.35%)
POWER 9.24 Increased By ▲ 0.16 (1.76%)
PPL 178.56 Increased By ▲ 4.31 (2.47%)
PRL 39.08 Increased By ▲ 1.01 (2.65%)
PTC 24.14 Increased By ▲ 0.07 (0.29%)
SEARL 107.85 Increased By ▲ 0.61 (0.57%)
SILK 0.97 No Change ▼ 0.00 (0%)
SSGC 39.11 Increased By ▲ 2.71 (7.45%)
SYM 19.12 Increased By ▲ 0.08 (0.42%)
TELE 8.60 Increased By ▲ 0.36 (4.37%)
TPLP 12.37 Increased By ▲ 0.59 (5.01%)
TRG 66.01 Increased By ▲ 1.13 (1.74%)
WAVESAPP 12.78 Increased By ▲ 1.15 (9.89%)
WTL 1.70 Increased By ▲ 0.02 (1.19%)
YOUW 3.95 Increased By ▲ 0.10 (2.6%)
BR100 11,930 Increased By 162.4 (1.38%)
BR30 35,660 Increased By 695.9 (1.99%)
KSE100 113,206 Increased By 1719 (1.54%)
KSE30 35,565 Increased By 630.8 (1.81%)

ISLAMABAD: Special Assistant to Prime Minister on Petroleum and Natural Resources, Dr Asim Hussain has said that 30 mmcfd gas would be added to the system by March 15. Talking to Business Recorder on Saturday, Asim said the additional gas would come from Badin, adding that his ministry has already added 100 mmcfd gas into the system in January from Kunnar-Pakasi field.
Total natural gas reservoirs at Nur-Condensate field Badin are estimated as 13.5 bcfd. According to Dr Asim, gas shortage at present has crossed 3 bcfd and the government is making all possible efforts to overcome energy shortage, which included import of Liquefied natural Gas (LNG), construction of Iran-Pakistan gas pipeline and Turkmenistan-Afghanistan-Pakistan-India gas pipeline project.
Recently Petroleum Ministry has finalised a plan to add over 800 mmcfd gas to the system through local resources. As per plan about 186 mmcfd gas would be added from Kunnar-Pakasi field, 160 mmcfd from Uch, 30 mmcfd from Sinjhoro, 30 mmcfd from Rehman, 30 mmcfd from Mehr, 30 mmcfd from Makori, 10 mmcfd from Nur-Bagla, 6 mmcfd from Jhakro, 15 mmcfd from Jhal Magsi, 10 mmcfd from Sajawal, 20 mmcfd from Kandkot and 120 mmcfd from Sara west.
The Kunnar-Pakasi Deep and Tando Allahyar integrated project is expected to produce 285 mmfcd gas, 387 tons of liquefied petroleum gas (LPG), 400 tons of liquefied natural gas (LNG) and 4,500 barrels of crude oil. Although additional gas would ease the crisis pressure to some extent, the current gas load-management programme would continue countrywide, as total gas supply is a little over 4 bcfd against demand of 6 bcfd. To alleviate the sufferings of people, public sector gas utilities are considering injecting Synthetic Natural Gas (SNG) to the system and have issued tender notices in this connection.

Copyright Business Recorder, 2012

Comments

Comments are closed.