AGL 40.00 No Change ▼ 0.00 (0%)
AIRLINK 132.66 Increased By ▲ 3.13 (2.42%)
BOP 6.89 Increased By ▲ 0.21 (3.14%)
CNERGY 4.57 Decreased By ▼ -0.06 (-1.3%)
DCL 8.92 Decreased By ▼ -0.02 (-0.22%)
DFML 42.75 Increased By ▲ 1.06 (2.54%)
DGKC 84.00 Increased By ▲ 0.23 (0.27%)
FCCL 32.90 Increased By ▲ 0.13 (0.4%)
FFBL 77.06 Increased By ▲ 1.59 (2.11%)
FFL 12.20 Increased By ▲ 0.73 (6.36%)
HUBC 110.01 Decreased By ▼ -0.54 (-0.49%)
HUMNL 14.40 Decreased By ▼ -0.16 (-1.1%)
KEL 5.53 Increased By ▲ 0.14 (2.6%)
KOSM 8.32 Decreased By ▼ -0.08 (-0.95%)
MLCF 39.67 Decreased By ▼ -0.12 (-0.3%)
NBP 65.50 Increased By ▲ 5.21 (8.64%)
OGDC 198.74 Decreased By ▼ -0.92 (-0.46%)
PAEL 26.00 Decreased By ▼ -0.65 (-2.44%)
PIBTL 7.62 Decreased By ▼ -0.04 (-0.52%)
PPL 159.00 Increased By ▲ 1.08 (0.68%)
PRL 26.24 Decreased By ▼ -0.49 (-1.83%)
PTC 18.35 Decreased By ▼ -0.11 (-0.6%)
SEARL 82.24 Decreased By ▼ -0.20 (-0.24%)
TELE 8.12 Decreased By ▼ -0.19 (-2.29%)
TOMCL 34.40 Decreased By ▼ -0.11 (-0.32%)
TPLP 8.98 Decreased By ▼ -0.08 (-0.88%)
TREET 16.88 Decreased By ▼ -0.59 (-3.38%)
TRG 59.49 Decreased By ▼ -1.83 (-2.98%)
UNITY 27.52 Increased By ▲ 0.09 (0.33%)
WTL 1.40 Increased By ▲ 0.02 (1.45%)
BR100 10,614 Increased By 206.9 (1.99%)
BR30 31,874 Increased By 160.5 (0.51%)
KSE100 98,972 Increased By 1644 (1.69%)
KSE30 30,784 Increased By 591.7 (1.96%)

ISLAMABAD: National Energy and Efficiency and Conservation Authority (NEECA) has offered 50 percent energy audit free of cost to Captive Power Plants (CPPs) on first-come-first-served basis.

In a reminder to the companies, NEECA Managing Director Dr Sardar Moazzam has stated that it is significant to indicate that as per the directions of the Cabinet Committee on Energy (CCoE), Petroleum Division conveyed on July 30, 2020 that NEECA has been assigned the task of conducting energy audits of gas based captive power units.

And emphasized that the advertisement for "Request for Proposal" for Energy Audits of Gas Based Captive Power Plants (CPPs) as identified by SNGPL and SSGC through private Engineering Consulting Firms was published in the newspapers on August 15, 2020.

NEECA has already communicated to share the possible date and time along with the technical information of the respective CPPs but no response in this regard has so far been received. He advised CPPs once again to indicate date and time as well as required technical information for preliminary assessment by October30, 2020. In case of non-compliance, the RLNG rates would be applied from January 1, 2021.

He maintained that conduct of Energy Audits for the CPPs is mandatory for the zero rated sectors including textile sector and the RING rates will be applicable to all the non-conforming CCPs by June 18, 2021.

Copyright Business Recorder, 2020

Comments

Comments are closed.