AIRLINK 189.64 Decreased By ▼ -7.01 (-3.56%)
BOP 10.09 Decreased By ▼ -0.05 (-0.49%)
CNERGY 6.68 Decreased By ▼ -0.01 (-0.15%)
FCCL 34.14 Increased By ▲ 1.12 (3.39%)
FFL 17.09 Increased By ▲ 0.44 (2.64%)
FLYNG 23.83 Increased By ▲ 1.38 (6.15%)
HUBC 126.05 Decreased By ▼ -1.24 (-0.97%)
HUMNL 13.79 Decreased By ▼ -0.11 (-0.79%)
KEL 4.77 Increased By ▲ 0.01 (0.21%)
KOSM 6.58 Increased By ▲ 0.21 (3.3%)
MLCF 43.28 Increased By ▲ 1.06 (2.51%)
OGDC 224.96 Increased By ▲ 11.93 (5.6%)
PACE 7.38 Increased By ▲ 0.37 (5.28%)
PAEL 41.74 Increased By ▲ 0.87 (2.13%)
PIAHCLA 17.19 Increased By ▲ 0.37 (2.2%)
PIBTL 8.41 Increased By ▲ 0.12 (1.45%)
POWER 9.05 Increased By ▲ 0.23 (2.61%)
PPL 193.09 Increased By ▲ 9.52 (5.19%)
PRL 37.34 Decreased By ▼ -0.93 (-2.43%)
PTC 24.02 Decreased By ▼ -0.05 (-0.21%)
SEARL 94.54 Decreased By ▼ -0.57 (-0.6%)
SILK 0.99 Decreased By ▼ -0.01 (-1%)
SSGC 39.93 Decreased By ▼ -0.38 (-0.94%)
SYM 17.77 Decreased By ▼ -0.44 (-2.42%)
TELE 8.66 Decreased By ▼ -0.07 (-0.8%)
TPLP 12.39 Increased By ▲ 0.18 (1.47%)
TRG 62.65 Decreased By ▼ -1.71 (-2.66%)
WAVESAPP 10.28 Decreased By ▼ -0.16 (-1.53%)
WTL 1.75 Decreased By ▼ -0.04 (-2.23%)
YOUW 3.97 Decreased By ▼ -0.03 (-0.75%)
BR100 11,814 Increased By 90.4 (0.77%)
BR30 36,234 Increased By 874.6 (2.47%)
KSE100 113,247 Increased By 609 (0.54%)
KSE30 35,712 Increased By 253.6 (0.72%)

ISLAMABAD: National Energy and Efficiency and Conservation Authority (NEECA) has offered 50 percent energy audit free of cost to Captive Power Plants (CPPs) on first-come-first-served basis.

In a reminder to the companies, NEECA Managing Director Dr Sardar Moazzam has stated that it is significant to indicate that as per the directions of the Cabinet Committee on Energy (CCoE), Petroleum Division conveyed on July 30, 2020 that NEECA has been assigned the task of conducting energy audits of gas based captive power units.

And emphasized that the advertisement for "Request for Proposal" for Energy Audits of Gas Based Captive Power Plants (CPPs) as identified by SNGPL and SSGC through private Engineering Consulting Firms was published in the newspapers on August 15, 2020.

NEECA has already communicated to share the possible date and time along with the technical information of the respective CPPs but no response in this regard has so far been received. He advised CPPs once again to indicate date and time as well as required technical information for preliminary assessment by October30, 2020. In case of non-compliance, the RLNG rates would be applied from January 1, 2021.

He maintained that conduct of Energy Audits for the CPPs is mandatory for the zero rated sectors including textile sector and the RING rates will be applicable to all the non-conforming CCPs by June 18, 2021.

Copyright Business Recorder, 2020

Comments

Comments are closed.