AGL 40.00 Decreased By ▼ -0.16 (-0.4%)
AIRLINK 129.53 Decreased By ▼ -2.20 (-1.67%)
BOP 6.68 Decreased By ▼ -0.01 (-0.15%)
CNERGY 4.63 Increased By ▲ 0.16 (3.58%)
DCL 8.94 Increased By ▲ 0.12 (1.36%)
DFML 41.69 Increased By ▲ 1.08 (2.66%)
DGKC 83.77 Decreased By ▼ -0.31 (-0.37%)
FCCL 32.77 Increased By ▲ 0.43 (1.33%)
FFBL 75.47 Increased By ▲ 6.86 (10%)
FFL 11.47 Increased By ▲ 0.12 (1.06%)
HUBC 110.55 Decreased By ▼ -1.21 (-1.08%)
HUMNL 14.56 Increased By ▲ 0.25 (1.75%)
KEL 5.39 Increased By ▲ 0.17 (3.26%)
KOSM 8.40 Decreased By ▼ -0.58 (-6.46%)
MLCF 39.79 Increased By ▲ 0.36 (0.91%)
NBP 60.29 No Change ▼ 0.00 (0%)
OGDC 199.66 Increased By ▲ 4.72 (2.42%)
PAEL 26.65 Decreased By ▼ -0.04 (-0.15%)
PIBTL 7.66 Increased By ▲ 0.18 (2.41%)
PPL 157.92 Increased By ▲ 2.15 (1.38%)
PRL 26.73 Increased By ▲ 0.05 (0.19%)
PTC 18.46 Increased By ▲ 0.16 (0.87%)
SEARL 82.44 Decreased By ▼ -0.58 (-0.7%)
TELE 8.31 Increased By ▲ 0.08 (0.97%)
TOMCL 34.51 Decreased By ▼ -0.04 (-0.12%)
TPLP 9.06 Increased By ▲ 0.25 (2.84%)
TREET 17.47 Increased By ▲ 0.77 (4.61%)
TRG 61.32 Decreased By ▼ -1.13 (-1.81%)
UNITY 27.43 Decreased By ▼ -0.01 (-0.04%)
WTL 1.38 Increased By ▲ 0.10 (7.81%)
BR100 10,407 Increased By 220 (2.16%)
BR30 31,713 Increased By 377.1 (1.2%)
KSE100 97,328 Increased By 1781.9 (1.86%)
KSE30 30,192 Increased By 614.4 (2.08%)
Pakistan Print 2020-12-31

Korangi, Nazimabad: KE removes illegal kunda connections

KARACHI: K-Electric (KE) continued its drive against illegal connections across Karachi. In Korangi, KE...
Published December 31, 2020

KARACHI: K-Electric (KE) continued its drive against illegal connections across Karachi.

In Korangi, KE successfully removed over 2,000 illegal hook connections from KDA Employees Society. An illegal underground network was also dismantled which was used for water boring from Jalalabad in Nazimabad.

The illegal connections, or kundas, weighing 1,700 kilograms, were taken down despite resistance from the local kunda mafia. The un-permitted connections, which are hazardous and pose a danger to the surrounding area, were placed onto Aerial Bundled Cables (ABC) located within the industrial area of Korangi.

In a separate drive in Jalalabad, located in Nazimabad, KE teams removed illegal underground and overhead cables weighing 232 kilograms, along with unauthorized electrical equipment. Approximately 62 kW electrical loads were used for illegal water boring in the area. Notices have been served to the culprits involved. According to KE spokesperson, “Illegal connections and encroachments around power infrastructure are major public safety hazards.” —PR

Copyright Business Recorder, 2020

Comments

Comments are closed.