AIRLINK 190.86 Decreased By ▼ -5.79 (-2.94%)
BOP 10.09 Decreased By ▼ -0.05 (-0.49%)
CNERGY 6.55 Decreased By ▼ -0.14 (-2.09%)
FCCL 33.55 Increased By ▲ 0.53 (1.61%)
FFL 16.34 Decreased By ▼ -0.31 (-1.86%)
FLYNG 23.12 Increased By ▲ 0.67 (2.98%)
HUBC 126.56 Decreased By ▼ -0.73 (-0.57%)
HUMNL 13.85 Decreased By ▼ -0.05 (-0.36%)
KEL 4.77 Increased By ▲ 0.01 (0.21%)
KOSM 6.40 Increased By ▲ 0.03 (0.47%)
MLCF 42.85 Increased By ▲ 0.63 (1.49%)
OGDC 213.00 Decreased By ▼ -0.03 (-0.01%)
PACE 6.99 Decreased By ▼ -0.02 (-0.29%)
PAEL 40.81 Decreased By ▼ -0.06 (-0.15%)
PIAHCLA 17.40 Increased By ▲ 0.58 (3.45%)
PIBTL 8.35 Increased By ▲ 0.06 (0.72%)
POWER 9.00 Increased By ▲ 0.18 (2.04%)
PPL 184.50 Increased By ▲ 0.93 (0.51%)
PRL 37.90 Decreased By ▼ -0.37 (-0.97%)
PTC 24.23 Increased By ▲ 0.16 (0.66%)
SEARL 95.20 Increased By ▲ 0.09 (0.09%)
SILK 1.00 No Change ▼ 0.00 (0%)
SSGC 39.66 Decreased By ▼ -0.65 (-1.61%)
SYM 17.85 Decreased By ▼ -0.36 (-1.98%)
TELE 8.74 Increased By ▲ 0.01 (0.11%)
TPLP 12.52 Increased By ▲ 0.31 (2.54%)
TRG 64.25 Decreased By ▼ -0.11 (-0.17%)
WAVESAPP 10.45 Increased By ▲ 0.01 (0.1%)
WTL 1.77 Decreased By ▼ -0.02 (-1.12%)
YOUW 3.99 Decreased By ▼ -0.01 (-0.25%)
BR100 11,702 Decreased By -21.1 (-0.18%)
BR30 35,371 Increased By 11.9 (0.03%)
KSE100 112,834 Increased By 196.2 (0.17%)
KSE30 35,491 Increased By 32.7 (0.09%)
Pakistan

KCR all set to commence operation today

  • The KCR train completed its successful run from Karachi City to Orangi railway station
  • The first regular train on the track, KCR 1 Up will start its journey from Orangi station at 4:16 pm today
Published February 10, 2021

(Karachi) The first regular train service of Karachi Circular Railways (KCR) will commence operation today after successful trial run, local media reported on Wednesday.

As per details, a KCR train completed its successful run from Karachi City to Orangi railway station. The test run of the KCR train operationalized the railway track from the City station to Orangi.

The said portion of the KCR track was not operationalized earlier due to various technical and other issues.

Meanwhile, the first regular train on the track, KCR 1 Up will start its journey from Orangi station at 4:16 pm today. The train will pass through the route of Manghopir, SITE, Shah Abdul Latif, Baldia, Lyari and Wazir Mansion stations to its destination to City railway station. The train will then run towards Dhabeji on its already operationalized route.

Similarly, KCR 2 Down train will reach Orangi at 10:10 am. On 14 kilometres long route from the City station to Orangi, there are eight stations and 12 railway crossing. The KCR train service will cover a distance of 74 kilometres from Orangi to Dhabeji.

Each train will run with five coaches having a seating capacity for 500 passengers and Rs30 fare.

Comments

Comments are closed.