AGL 38.20 Increased By ▲ 0.05 (0.13%)
AIRLINK 129.30 Increased By ▲ 4.23 (3.38%)
BOP 7.85 Increased By ▲ 1.00 (14.6%)
CNERGY 4.66 Increased By ▲ 0.21 (4.72%)
DCL 8.35 Increased By ▲ 0.44 (5.56%)
DFML 38.86 Increased By ▲ 1.52 (4.07%)
DGKC 82.20 Increased By ▲ 4.43 (5.7%)
FCCL 33.64 Increased By ▲ 3.06 (10.01%)
FFBL 75.75 Increased By ▲ 6.89 (10.01%)
FFL 12.83 Increased By ▲ 0.97 (8.18%)
HUBC 110.72 Increased By ▲ 6.22 (5.95%)
HUMNL 14.03 Increased By ▲ 0.54 (4%)
KEL 5.22 Increased By ▲ 0.57 (12.26%)
KOSM 7.69 Increased By ▲ 0.52 (7.25%)
MLCF 40.08 Increased By ▲ 3.64 (9.99%)
NBP 72.51 Increased By ▲ 6.59 (10%)
OGDC 189.18 Increased By ▲ 9.65 (5.38%)
PAEL 25.74 Increased By ▲ 1.31 (5.36%)
PIBTL 7.38 Increased By ▲ 0.23 (3.22%)
PPL 153.45 Increased By ▲ 9.75 (6.78%)
PRL 25.52 Increased By ▲ 1.20 (4.93%)
PTC 17.92 Increased By ▲ 1.52 (9.27%)
SEARL 82.50 Increased By ▲ 3.93 (5%)
TELE 7.63 Increased By ▲ 0.41 (5.68%)
TOMCL 32.50 Increased By ▲ 0.53 (1.66%)
TPLP 8.48 Increased By ▲ 0.35 (4.31%)
TREET 16.74 Increased By ▲ 0.61 (3.78%)
TRG 56.01 Increased By ▲ 1.35 (2.47%)
UNITY 28.85 Increased By ▲ 1.35 (4.91%)
WTL 1.34 Increased By ▲ 0.05 (3.88%)
BR100 10,684 Increased By 595 (5.9%)
BR30 31,445 Increased By 1935.9 (6.56%)
KSE100 99,269 Increased By 4695.1 (4.96%)
KSE30 31,032 Increased By 1587.6 (5.39%)
Business & Finance

Pakistan cement manufacturer installs 7.5MW WHRPP to save costs

  • The company on Monday announced that it has successfully completed the installation and commissioning of a 7.5-megawatt Waste Heat Recovery Power Plant (WHRPP) at its site in Mangowal, district Khushab.
Published February 15, 2021

Utilizing energy-saving technologies for sustainable growth is gaining traction among businesses in Pakistan after cement manufacturer Flying Cement announced to have successfully installed a Waste Heat Recovery Power Plant (WHRPP).

The company on Monday announced that it has successfully completed the installation and commissioning of a 7.5-megawatt Waste Heat Recovery Power Plant (WHRPP) at its site in Mangowal, district Khushab.

The cement manufacturer was of the view that the employment of this technology will augment our ability to process waste heat absorbed in boilers to produce steam at a suitable pressure to power turbines for the generation of electricity.

“Adoption of Waste Heat Recovery Power Plant (WHRPP) technology will result in significant cost savings in power consumption for the company. It also firms following cements commitment to reducing carbon footprint and contributes towards a green of Pakistan,” the company added.

Days ago, one of Pakistan’s leading steel manufacturer Agha Steel Industries Limited (ASIL) announced to set up a solar power plant to meet its energy needs.

ASIL signed a contract with Renewable Power Private Limited for installing a 2.25-megawatt solar power project at its production facility located at Port Qasim Authority, Karachi.

The steel manufacturer informed that Meezan Bank Limited has been nominated as the lead Islamic Bank arranger for the project. “This would be among one of the largest solar power projects installed by a steel manufacturer in Pakistan,” informed the company.

Comments

Comments are closed.