AGL 38.02 Increased By ▲ 0.08 (0.21%)
AIRLINK 197.36 Increased By ▲ 3.45 (1.78%)
BOP 9.54 Increased By ▲ 0.22 (2.36%)
CNERGY 5.91 Increased By ▲ 0.07 (1.2%)
DCL 8.82 Increased By ▲ 0.14 (1.61%)
DFML 35.74 Decreased By ▼ -0.72 (-1.97%)
DGKC 96.86 Increased By ▲ 4.32 (4.67%)
FCCL 35.25 Increased By ▲ 1.28 (3.77%)
FFBL 88.94 Increased By ▲ 6.64 (8.07%)
FFL 13.17 Increased By ▲ 0.42 (3.29%)
HUBC 127.55 Increased By ▲ 6.94 (5.75%)
HUMNL 13.50 Decreased By ▼ -0.10 (-0.74%)
KEL 5.32 Increased By ▲ 0.10 (1.92%)
KOSM 7.00 Increased By ▲ 0.48 (7.36%)
MLCF 44.70 Increased By ▲ 2.59 (6.15%)
NBP 61.42 Increased By ▲ 1.61 (2.69%)
OGDC 214.67 Increased By ▲ 3.50 (1.66%)
PAEL 38.79 Increased By ▲ 1.21 (3.22%)
PIBTL 8.25 Increased By ▲ 0.18 (2.23%)
PPL 193.08 Increased By ▲ 2.76 (1.45%)
PRL 38.66 Increased By ▲ 0.49 (1.28%)
PTC 25.80 Increased By ▲ 2.35 (10.02%)
SEARL 103.60 Increased By ▲ 5.66 (5.78%)
TELE 8.30 Increased By ▲ 0.08 (0.97%)
TOMCL 35.00 Decreased By ▼ -0.03 (-0.09%)
TPLP 13.30 Decreased By ▼ -0.25 (-1.85%)
TREET 22.16 Decreased By ▼ -0.57 (-2.51%)
TRG 55.59 Increased By ▲ 2.72 (5.14%)
UNITY 32.97 Increased By ▲ 0.01 (0.03%)
WTL 1.60 Increased By ▲ 0.08 (5.26%)
BR100 11,727 Increased By 342.7 (3.01%)
BR30 36,377 Increased By 1165.1 (3.31%)
KSE100 109,513 Increased By 3238.2 (3.05%)
KSE30 34,513 Increased By 1160.1 (3.48%)

HYDERABAD: The Sindh High Court Thursday ordered a builder to bear the cost of repair of 2 bungalows which developed fissures due to construction work at the bordering ground plus 11 commercial building in Qasimabad taluka.

According to details, Hyderabad Circuit Bench comprising justice Nadeem Akhtar and justice Arshad Hussain Khan here ordered the M/S Shams Builders and Developers to implement the order on urgent basis.

On the basis of mutual consensus of the petitioners Manzoor Ali Khan and Saeed Ahmed Waga and the respondent builder, the court assigned the work of assessing the damage caused to the 2 bungalows in Data Nagar Housing scheme to the Structural Engineer Fareed Shaikh.

The court directed Shaikh to complete the assessment work within one week after which the builder would start the repair work in the 2 houses within 7 days.

During the hearing the petitioners' counsel advocate Irfan Qureshi argued that Sindh Building Control Authority (SBCA) had unlawfully approved 11 floors of the building.

He contended that the builder and SBCA had shown a 130 feet wide road whereas the actual size of the road was around 60 feet.

"There are 2 sides of the road divided by the green belt. One side of it along which the Shams Icon is being built is only around 60 feet wide," he added.

The SBCA's Regional Director Naveed Asim apprised the court that the 11-storey commercial building consisted of 3 floors of parking and 8 floors for residential purpose.

Arbab Muhammad Deen Memon, who represented the builder, assured the SHC that they would bear the full cost of repair.

The service charges to the structural engineer would also be paid by the builder.

The matter was adjourned to April 13.

Comments

Comments are closed.