AGL 40.21 Increased By ▲ 0.18 (0.45%)
AIRLINK 127.64 Decreased By ▼ -0.06 (-0.05%)
BOP 6.67 Increased By ▲ 0.06 (0.91%)
CNERGY 4.45 Decreased By ▼ -0.15 (-3.26%)
DCL 8.73 Decreased By ▼ -0.06 (-0.68%)
DFML 41.16 Decreased By ▼ -0.42 (-1.01%)
DGKC 86.11 Increased By ▲ 0.32 (0.37%)
FCCL 32.56 Increased By ▲ 0.07 (0.22%)
FFBL 64.38 Increased By ▲ 0.35 (0.55%)
FFL 11.61 Increased By ▲ 1.06 (10.05%)
HUBC 112.46 Increased By ▲ 1.69 (1.53%)
HUMNL 14.81 Decreased By ▼ -0.26 (-1.73%)
KEL 5.04 Increased By ▲ 0.16 (3.28%)
KOSM 7.36 Decreased By ▼ -0.09 (-1.21%)
MLCF 40.33 Decreased By ▼ -0.19 (-0.47%)
NBP 61.08 Increased By ▲ 0.03 (0.05%)
OGDC 194.18 Decreased By ▼ -0.69 (-0.35%)
PAEL 26.91 Decreased By ▼ -0.60 (-2.18%)
PIBTL 7.28 Decreased By ▼ -0.53 (-6.79%)
PPL 152.68 Increased By ▲ 0.15 (0.1%)
PRL 26.22 Decreased By ▼ -0.36 (-1.35%)
PTC 16.14 Decreased By ▼ -0.12 (-0.74%)
SEARL 85.70 Increased By ▲ 1.56 (1.85%)
TELE 7.67 Decreased By ▼ -0.29 (-3.64%)
TOMCL 36.47 Decreased By ▼ -0.13 (-0.36%)
TPLP 8.79 Increased By ▲ 0.13 (1.5%)
TREET 16.84 Decreased By ▼ -0.82 (-4.64%)
TRG 62.74 Increased By ▲ 4.12 (7.03%)
UNITY 28.20 Increased By ▲ 1.34 (4.99%)
WTL 1.34 Decreased By ▼ -0.04 (-2.9%)
BR100 10,086 Increased By 85.5 (0.85%)
BR30 31,170 Increased By 168.1 (0.54%)
KSE100 94,764 Increased By 571.8 (0.61%)
KSE30 29,410 Increased By 209 (0.72%)

BEIJING: An agreement on a renovation project of a waste heat recovery power plant was signed between China Sinoma Energy Conservation Limited (Sinoma EC) and Lucky Cement last weekend.

The generating capacity of the two power stations - Lines CD and 01 (former AB) of the Pezu Plant in Darra Pezu, Khyber Pakhtunkhwa - utilising waste heat is expected to increase by about 4MW after the transformation.

The agreement came after a contract entered between the two sides on a 7500t/d supporting power station project with waste heat of cement in late March this year, according to China Economic Net (CEN) on Tuesday.

Sinoma EC, a patent-holding company specialised in energy-saving and emission-reduction, started cooperation with Lucky Cement in 2008. Since then, it has undertaken several projects, including the Pezu Lines AB and CD waste heat recovery power plant with a generating capacity of 10 MW respectively, the 15 MW Karachi Line EFG power plant with waste heat, Karachi Line H waste heat boiler extension, etc.

Waste thermal energy is one of the largest sources of inexpensive and clean energy available. Waste heat power generation, or Waste Heat to Power (WHP), is the process of recovering waste heat and using it to generate power with no combustion and no emissions. In cement plants, heat generated through rotary kiln preheater (PH) and AQC exhaust hot gases are used to generate steam in steam generator (Boiler) which is further used to generate electricity/power through steam turbo generator (STG).

Recovery of waste heat helps reduce energy costs for industrial processes. By using the waste heat to generate emission-free electricity, industrial users can put wasted energy back into the process that created it, route the power somewhere else in the facility, or sell it to the grid to support clean energy production, distribution and use. Moreover, such practices are in conformity with the initiative to build a green CPEC (China Pakistan Economic Corridor).

Due to the upgraded epidemic control protocols, Lucky Group appointed Muzamil, head of the Pezu Waste Heat Power Plant to complete the signing ceremony in a simplistic way with Chinese counterparts Wang Jianfeng, Vice Director of Marketing Department of Sinoma EC International Engineering Branch, and Marketing Manager Liu Geng.

Comments

Comments are closed.