AIRLINK 184.71 Increased By ▲ 0.85 (0.46%)
BOP 12.12 Increased By ▲ 0.30 (2.54%)
CNERGY 7.50 Decreased By ▼ -0.02 (-0.27%)
FCCL 47.52 Increased By ▲ 1.14 (2.46%)
FFL 16.15 No Change ▼ 0.00 (0%)
FLYNG 28.51 Increased By ▲ 0.73 (2.63%)
HUBC 141.58 Increased By ▲ 6.49 (4.8%)
HUMNL 13.18 Increased By ▲ 0.12 (0.92%)
KEL 4.63 Increased By ▲ 0.01 (0.22%)
KOSM 6.31 Increased By ▲ 0.11 (1.77%)
MLCF 60.37 Increased By ▲ 1.20 (2.03%)
OGDC 225.48 Increased By ▲ 2.42 (1.08%)
PACE 6.07 Increased By ▲ 0.28 (4.84%)
PAEL 48.14 Increased By ▲ 3.19 (7.1%)
PIAHCLA 18.27 Increased By ▲ 0.61 (3.45%)
PIBTL 11.05 Increased By ▲ 0.39 (3.66%)
POWER 11.83 Increased By ▲ 0.10 (0.85%)
PPL 189.65 Increased By ▲ 2.60 (1.39%)
PRL 36.36 Increased By ▲ 0.09 (0.25%)
PTC 24.52 Decreased By ▼ -0.25 (-1.01%)
SEARL 102.92 Increased By ▲ 1.97 (1.95%)
SILK 1.15 No Change ▼ 0.00 (0%)
SSGC 36.73 Decreased By ▼ -0.23 (-0.62%)
SYM 15.71 Increased By ▲ 0.02 (0.13%)
TELE 8.11 Increased By ▲ 0.23 (2.92%)
TPLP 11.26 Increased By ▲ 0.43 (3.97%)
TRG 70.31 Increased By ▲ 3.69 (5.54%)
WAVESAPP 11.16 Increased By ▲ 0.34 (3.14%)
WTL 1.40 Increased By ▲ 0.07 (5.26%)
YOUW 3.78 Decreased By ▼ -0.03 (-0.79%)
BR100 12,602 Increased By 143.7 (1.15%)
BR30 39,293 Increased By 986 (2.57%)
KSE100 117,974 Increased By 972.9 (0.83%)
KSE30 36,496 Increased By 361.4 (1%)

PESHAWAR: The Inspector General of Police (IGP) Khyber Pakhtunkhwa Dr Sanaullah Abbasi Thursday inaugurated a Watch Tower for the security of flight operations at Bacha Khan International Airport Peshawar.

DG PCU Ashfaq Anwar gave a comprehensive briefing to the IGP about the newly built watch tower.

Watch tower is spread over an area of 3 kanal in Palawano Pull Tehkal Peshawar and fully equipped with night vision cameras, latest modern technologies, wireless system and residential accommodation for the police officials.

The IGP Dr Sanaullah Abbasi went around different parts of the newly-built watch tower and inspected the security of the funnel area and the facilities provided to jawans.

It may be recalled that for enhancing security of aircrafts flying at low attitudes in funnel area of Peshawar a project 08 watch towers was initiated at a total cost of Rs.172.519 million and with the inauguration of Tehkal watch tower the project is completed.

With the construction of these watch towers, the impending danger to the flights could be averted successfully and the surveillance and monitoring capability police officials has been improved which will lead to peace and tranquility in the area.

Copyright Business Recorder, 2021

Comments

Comments are closed.