AGL 38.02 Increased By ▲ 0.08 (0.21%)
AIRLINK 197.36 Increased By ▲ 3.45 (1.78%)
BOP 9.54 Increased By ▲ 0.22 (2.36%)
CNERGY 5.91 Increased By ▲ 0.07 (1.2%)
DCL 8.82 Increased By ▲ 0.14 (1.61%)
DFML 35.74 Decreased By ▼ -0.72 (-1.97%)
DGKC 96.86 Increased By ▲ 4.32 (4.67%)
FCCL 35.25 Increased By ▲ 1.28 (3.77%)
FFBL 88.94 Increased By ▲ 6.64 (8.07%)
FFL 13.17 Increased By ▲ 0.42 (3.29%)
HUBC 127.55 Increased By ▲ 6.94 (5.75%)
HUMNL 13.50 Decreased By ▼ -0.10 (-0.74%)
KEL 5.32 Increased By ▲ 0.10 (1.92%)
KOSM 7.00 Increased By ▲ 0.48 (7.36%)
MLCF 44.70 Increased By ▲ 2.59 (6.15%)
NBP 61.42 Increased By ▲ 1.61 (2.69%)
OGDC 214.67 Increased By ▲ 3.50 (1.66%)
PAEL 38.79 Increased By ▲ 1.21 (3.22%)
PIBTL 8.25 Increased By ▲ 0.18 (2.23%)
PPL 193.08 Increased By ▲ 2.76 (1.45%)
PRL 38.66 Increased By ▲ 0.49 (1.28%)
PTC 25.80 Increased By ▲ 2.35 (10.02%)
SEARL 103.60 Increased By ▲ 5.66 (5.78%)
TELE 8.30 Increased By ▲ 0.08 (0.97%)
TOMCL 35.00 Decreased By ▼ -0.03 (-0.09%)
TPLP 13.30 Decreased By ▼ -0.25 (-1.85%)
TREET 22.16 Decreased By ▼ -0.57 (-2.51%)
TRG 55.59 Increased By ▲ 2.72 (5.14%)
UNITY 32.97 Increased By ▲ 0.01 (0.03%)
WTL 1.60 Increased By ▲ 0.08 (5.26%)
BR100 11,727 Increased By 342.7 (3.01%)
BR30 36,377 Increased By 1165.1 (3.31%)
KSE100 109,513 Increased By 3238.2 (3.05%)
KSE30 34,513 Increased By 1160.1 (3.48%)

KARACHI: Administrator Karachi Laeeq Ahmed on Wednesday reviewed the measures being taken by Karachi Metropolitan Corporation (KMC) in view of monsoon season. He said that drainage pumps and other machinery and vehicles have been arranged. 20 new pumps have been purchased for drainage.

The Administrator passed these remarks while addressing a meeting to review measures at City Warden Headquarters Gulshan-e-Iqbal here.

Senior Director Coordination Khalid Khan, Director General Works Shabih Ul Hasnain Zaidi, Chief Engineer Electrical and Mechanical Abbas Shah, Director City Warden Raja Rustam and other officers were also present on the occasion.

Ahmed said that existing 11 de-watering pumps, tractors, dumpers and master trucks have also been repaired so that as soon as it starts raining, these pumps will be delivered to the places in the city where drainage is required.

“It is hoped that the citizens will see a better situation during the rainy season this time as compared to previous years,” he added.

The Administrator said that in Karachi 12 heavy pumps will be installed at places where there is a possibility of accumulation of rain water in large quantities while 10 new pumps will be placed to draw water from underpasses and also in case of complaints from citizens.

He said that based on last year’s experience, preparations have been made for the monsoon season and every effort is being made to provide better facilities to the citizens.

Copyright Business Recorder, 2021

Comments

Comments are closed.