AGL 37.99 Decreased By ▼ -0.03 (-0.08%)
AIRLINK 215.53 Increased By ▲ 18.17 (9.21%)
BOP 9.80 Increased By ▲ 0.26 (2.73%)
CNERGY 6.79 Increased By ▲ 0.88 (14.89%)
DCL 9.17 Increased By ▲ 0.35 (3.97%)
DFML 38.96 Increased By ▲ 3.22 (9.01%)
DGKC 100.25 Increased By ▲ 3.39 (3.5%)
FCCL 36.70 Increased By ▲ 1.45 (4.11%)
FFBL 88.94 No Change ▼ 0.00 (0%)
FFL 14.49 Increased By ▲ 1.32 (10.02%)
HUBC 134.13 Increased By ▲ 6.58 (5.16%)
HUMNL 13.63 Increased By ▲ 0.13 (0.96%)
KEL 5.69 Increased By ▲ 0.37 (6.95%)
KOSM 7.32 Increased By ▲ 0.32 (4.57%)
MLCF 45.87 Increased By ▲ 1.17 (2.62%)
NBP 61.28 Decreased By ▼ -0.14 (-0.23%)
OGDC 232.59 Increased By ▲ 17.92 (8.35%)
PAEL 40.73 Increased By ▲ 1.94 (5%)
PIBTL 8.58 Increased By ▲ 0.33 (4%)
PPL 203.34 Increased By ▲ 10.26 (5.31%)
PRL 40.81 Increased By ▲ 2.15 (5.56%)
PTC 28.31 Increased By ▲ 2.51 (9.73%)
SEARL 108.51 Increased By ▲ 4.91 (4.74%)
TELE 8.74 Increased By ▲ 0.44 (5.3%)
TOMCL 35.83 Increased By ▲ 0.83 (2.37%)
TPLP 13.84 Increased By ▲ 0.54 (4.06%)
TREET 24.38 Increased By ▲ 2.22 (10.02%)
TRG 61.15 Increased By ▲ 5.56 (10%)
UNITY 34.84 Increased By ▲ 1.87 (5.67%)
WTL 1.72 Increased By ▲ 0.12 (7.5%)
BR100 12,244 Increased By 517.6 (4.41%)
BR30 38,419 Increased By 2042.6 (5.62%)
KSE100 113,924 Increased By 4411.3 (4.03%)
KSE30 36,044 Increased By 1530.5 (4.43%)

ISLAMABAD: Inauguration of two EV charging stations at Bhera and Pindi Bhattian, just outside M-2 Motorway on Saturday brought a big sigh of relief to Electric Vehicle owners of Islamabad and Lahore who will be able to commute between the two cities after a year-long wait for the facility. The stations have been indigenously designed, manufactured and installed by Tesla Industries, Pakistan. They are installing another such charging station near Gujrat on GT Road that will start functioning before Eid.

It is important to note that Motorway and Highway authorities have completely failed to establish even one EV charging facility across Pakistan despite government's clear policy of encouraging the use of clean energy at every level.

The inaugurated chargers have been installed at old CNG stations just on the periphery of M-2 Motorway at Bhera and Pindi Bhattian. One has to take the exit at Bhera (either coming from Islamabad or going to Islamabad) and after paying the respective toll, has to go to the CNG station to recharge his vehicle and then enter the Motorway from the other toll. Same is the case with the commuters intending to charge their vehicles at Pindi Bhattian.

Both the stations equipped with one 120 kWh charger (it takes 40 minutes to fully charge a 70 kWh battery) and one 60 kWh charger (it takes more than an hour to fully charge a 70 kWh battery). Both the stations have executive lounges for the commuters to rest and refresh while their vehicles gets the charge. For commuters of GT Road another charger of 60kwh has been installed at Hardees near Gujrat.

Federal Cabinet approved a comprehensive EV policy for 4-Wheelers on December 22, 2020 that offered a series of incentives to EV importers, manufacturers and end-users. These incentives included decrease in import duties and local taxes on CBU units, CKD units, parts and charging equipment; complete waiver of registration fees, annual motor vehicle tax and 50 percent relief on Motorway/Highway tolls.

But it is ironical that despite the federal government's major steps on incentivizing the use of Electric Vehicles (EVs) its departments are completely aloof of the government's vision. It is the private sector that has to step forward always to get these incentives implemented, the installation of EV chargers by a private enterprise is only one example. So, the dream of going to Lahore or coming to Islamabad on an EV has been made a reality by Tesla Industries who plans to install more chargers on GT Road and alongside Motorway as the demand soars.-PR

Copyright Business Recorder, 2021

Comments

Comments are closed.