AIRLINK 196.00 Increased By ▲ 1.17 (0.6%)
BOP 9.85 Increased By ▲ 0.04 (0.41%)
CNERGY 7.46 Increased By ▲ 0.10 (1.36%)
FCCL 40.33 Increased By ▲ 1.75 (4.54%)
FFL 16.55 Increased By ▲ 0.10 (0.61%)
FLYNG 28.05 Increased By ▲ 0.51 (1.85%)
HUBC 133.25 Increased By ▲ 1.50 (1.14%)
HUMNL 13.90 Increased By ▲ 0.04 (0.29%)
KEL 4.64 Decreased By ▼ -0.02 (-0.43%)
KOSM 6.66 No Change ▼ 0.00 (0%)
MLCF 46.95 Increased By ▲ 1.56 (3.44%)
OGDC 216.98 Increased By ▲ 2.99 (1.4%)
PACE 6.87 Increased By ▲ 0.01 (0.15%)
PAEL 40.57 Increased By ▲ 0.51 (1.27%)
PIAHCLA 17.26 Increased By ▲ 0.47 (2.8%)
PIBTL 8.38 Increased By ▲ 0.06 (0.72%)
POWER 9.75 Increased By ▲ 0.32 (3.39%)
PPL 184.90 Increased By ▲ 2.71 (1.49%)
PRL 42.30 Increased By ▲ 0.47 (1.12%)
PTC 24.88 Increased By ▲ 0.32 (1.3%)
SEARL 105.52 Increased By ▲ 2.99 (2.92%)
SILK 1.00 No Change ▼ 0.00 (0%)
SSGC 40.00 Increased By ▲ 0.56 (1.42%)
SYM 17.53 Increased By ▲ 0.20 (1.15%)
TELE 8.80 Increased By ▲ 0.04 (0.46%)
TPLP 12.85 Increased By ▲ 0.10 (0.78%)
TRG 66.16 Increased By ▲ 0.76 (1.16%)
WAVESAPP 11.20 Increased By ▲ 0.09 (0.81%)
WTL 1.71 Increased By ▲ 0.01 (0.59%)
YOUW 3.98 Increased By ▲ 0.04 (1.02%)
BR100 12,086 Increased By 112.4 (0.94%)
BR30 36,703 Increased By 556.9 (1.54%)
KSE100 114,211 Increased By 768 (0.68%)
KSE30 35,905 Increased By 269.8 (0.76%)

ISLAMABAD: Inauguration of two EV charging stations at Bhera and Pindi Bhattian, just outside M-2 Motorway on Saturday brought a big sigh of relief to Electric Vehicle owners of Islamabad and Lahore who will be able to commute between the two cities after a year-long wait for the facility. The stations have been indigenously designed, manufactured and installed by Tesla Industries, Pakistan. They are installing another such charging station near Gujrat on GT Road that will start functioning before Eid.

It is important to note that Motorway and Highway authorities have completely failed to establish even one EV charging facility across Pakistan despite government's clear policy of encouraging the use of clean energy at every level.

The inaugurated chargers have been installed at old CNG stations just on the periphery of M-2 Motorway at Bhera and Pindi Bhattian. One has to take the exit at Bhera (either coming from Islamabad or going to Islamabad) and after paying the respective toll, has to go to the CNG station to recharge his vehicle and then enter the Motorway from the other toll. Same is the case with the commuters intending to charge their vehicles at Pindi Bhattian.

Both the stations equipped with one 120 kWh charger (it takes 40 minutes to fully charge a 70 kWh battery) and one 60 kWh charger (it takes more than an hour to fully charge a 70 kWh battery). Both the stations have executive lounges for the commuters to rest and refresh while their vehicles gets the charge. For commuters of GT Road another charger of 60kwh has been installed at Hardees near Gujrat.

Federal Cabinet approved a comprehensive EV policy for 4-Wheelers on December 22, 2020 that offered a series of incentives to EV importers, manufacturers and end-users. These incentives included decrease in import duties and local taxes on CBU units, CKD units, parts and charging equipment; complete waiver of registration fees, annual motor vehicle tax and 50 percent relief on Motorway/Highway tolls.

But it is ironical that despite the federal government's major steps on incentivizing the use of Electric Vehicles (EVs) its departments are completely aloof of the government's vision. It is the private sector that has to step forward always to get these incentives implemented, the installation of EV chargers by a private enterprise is only one example. So, the dream of going to Lahore or coming to Islamabad on an EV has been made a reality by Tesla Industries who plans to install more chargers on GT Road and alongside Motorway as the demand soars.-PR

Copyright Business Recorder, 2021

Comments

Comments are closed.