AIRLINK 193.50 No Change ▼ 0.00 (0%)
BOP 9.93 Increased By ▲ 0.29 (3.01%)
CNERGY 7.66 Increased By ▲ 0.13 (1.73%)
FCCL 37.80 Increased By ▲ 0.10 (0.27%)
FFL 15.77 Increased By ▲ 0.17 (1.09%)
FLYNG 25.50 Decreased By ▼ -0.09 (-0.35%)
HUBC 130.00 Increased By ▲ 2.93 (2.31%)
HUMNL 13.65 Increased By ▲ 0.15 (1.11%)
KEL 4.71 Increased By ▲ 0.13 (2.84%)
KOSM 6.22 Increased By ▲ 0.12 (1.97%)
MLCF 44.32 Increased By ▲ 0.36 (0.82%)
OGDC 208.00 Increased By ▲ 4.76 (2.34%)
PACE 6.57 Increased By ▲ 0.17 (2.66%)
PAEL 40.59 Decreased By ▼ -0.39 (-0.95%)
PIAHCLA 17.55 Increased By ▲ 0.06 (0.34%)
PIBTL 8.12 Increased By ▲ 0.46 (6.01%)
POWER 9.18 Increased By ▲ 0.10 (1.1%)
PPL 179.79 Increased By ▲ 5.54 (3.18%)
PRL 39.20 Increased By ▲ 1.13 (2.97%)
PTC 24.01 Decreased By ▼ -0.06 (-0.25%)
SEARL 107.68 Increased By ▲ 0.44 (0.41%)
SILK 0.97 No Change ▼ 0.00 (0%)
SSGC 38.88 Increased By ▲ 2.48 (6.81%)
SYM 19.03 Decreased By ▼ -0.01 (-0.05%)
TELE 8.65 Increased By ▲ 0.41 (4.98%)
TPLP 12.40 Increased By ▲ 0.62 (5.26%)
TRG 65.80 Increased By ▲ 0.92 (1.42%)
WAVESAPP 12.79 Increased By ▲ 1.16 (9.97%)
WTL 1.70 Increased By ▲ 0.02 (1.19%)
YOUW 3.96 Increased By ▲ 0.11 (2.86%)
BR100 11,930 Increased By 162.4 (1.38%)
BR30 35,660 Increased By 695.9 (1.99%)
KSE100 113,206 Increased By 1719 (1.54%)
KSE30 35,565 Increased By 630.8 (1.81%)

KARACHI: Sindh Minister for Energy Imtiaz Ahmed Sheikh on Wednesday said that his department, Engro Energy Limited and a group of Karachi-based industrialists would soon ink a memorandum of understanding (MoU) to establish a 400-megawatt solar-wind electricity generation power house to provide low-cost and uninterrupted power to the industrial units in Sindh, especially Karachi.

In a statement, he said that the Sindh government would provide land at Jhimpir for the proposed power plant that would initially produce 50MW electricity in the first phase, and later its capacity will be increased to 400MW.

He said that Sindh Transmission and Dispatch Company (STDC) will install a grid and transmission line to supply uninterrupted power to Karachi’s industries from this power plant. He said that the legal matters with regard to the MoU were decided in a meeting held Wednesday in the Sindh Energy Department, adding work on the project will start soon after the signing of the MoU.

Copyright Business Recorder, 2021

Comments

Comments are closed.