AIRLINK 172.70 Decreased By ▼ -3.03 (-1.72%)
BOP 13.30 Increased By ▲ 0.18 (1.37%)
CNERGY 7.39 Decreased By ▼ -0.15 (-1.99%)
FCCL 43.62 Decreased By ▼ -0.29 (-0.66%)
FFL 14.88 Decreased By ▼ -0.13 (-0.87%)
FLYNG 26.49 Decreased By ▼ -0.41 (-1.52%)
HUBC 129.80 Decreased By ▼ -0.43 (-0.33%)
HUMNL 13.20 Decreased By ▼ -0.14 (-1.05%)
KEL 4.45 Decreased By ▼ -0.05 (-1.11%)
KOSM 6.04 Decreased By ▼ -0.02 (-0.33%)
MLCF 55.30 Decreased By ▼ -0.73 (-1.3%)
OGDC 212.35 Decreased By ▼ -2.42 (-1.13%)
PACE 5.94 Decreased By ▼ -0.04 (-0.67%)
PAEL 41.20 Increased By ▲ 0.30 (0.73%)
PIAHCLA 16.35 Increased By ▲ 0.03 (0.18%)
PIBTL 9.58 Decreased By ▼ -0.17 (-1.74%)
POWER 11.52 Decreased By ▼ -0.24 (-2.04%)
PPL 178.20 Decreased By ▼ -3.28 (-1.81%)
PRL 33.48 Decreased By ▼ -0.74 (-2.16%)
PTC 22.82 Decreased By ▼ -0.24 (-1.04%)
SEARL 94.45 Decreased By ▼ -1.27 (-1.33%)
SILK 1.18 Increased By ▲ 0.04 (3.51%)
SSGC 34.94 Decreased By ▼ -0.51 (-1.44%)
SYM 15.75 No Change ▼ 0.00 (0%)
TELE 7.79 Decreased By ▼ -0.08 (-1.02%)
TPLP 10.83 Decreased By ▼ -0.15 (-1.37%)
TRG 60.90 Increased By ▲ 0.40 (0.66%)
WAVESAPP 10.70 Decreased By ▼ -0.11 (-1.02%)
WTL 1.33 Decreased By ▼ -0.02 (-1.48%)
YOUW 3.80 Increased By ▲ 0.03 (0.8%)
BR100 12,019 Decreased By -35.1 (-0.29%)
BR30 36,238 Decreased By -228.7 (-0.63%)
KSE100 113,742 Decreased By -614.2 (-0.54%)
KSE30 35,068 Decreased By -279 (-0.79%)

LAHORE: The Water and Sanitation Authority (Wasa) Lahore inaugurated Rs. 75 million ‘Chungi Amr Indus Shanghai Drain Rehabilitation Project’ on Monday.

Punjab Housing Minister Malik Asad Khokhar, political and social figures and senior officials attended the inaugural ceremony.

As per the details shared by the Wasa, the rainwater drain has been connected to the WASA sewerage system. The project was launched by Punjab Housing Minister Malik Asad Khokhar three months ago.

Commenting on the project, Wasa Deputy Managing Director Ghufran Ahmed said that a 2-km long pressurized sewer pipe was laid to connect the drain to the main sewerage system. “With the completion of this project, the long-standing problem of the residents of the area has been resolved; the rehabilitation of the Shanghai Drain will end the accumulation of water along the Shanghai Drain,” he added.

Copyright Business Recorder, 2022

Comments

Comments are closed.