AGL 38.40 Decreased By ▼ -0.08 (-0.21%)
AIRLINK 197.88 Decreased By ▼ -5.14 (-2.53%)
BOP 9.83 Decreased By ▼ -0.34 (-3.34%)
CNERGY 6.32 Decreased By ▼ -0.22 (-3.36%)
DCL 9.30 Decreased By ▼ -0.28 (-2.92%)
DFML 39.00 Decreased By ▼ -1.02 (-2.55%)
DGKC 96.20 Decreased By ▼ -1.88 (-1.92%)
FCCL 35.03 Increased By ▲ 0.07 (0.2%)
FFBL 86.00 Decreased By ▼ -0.43 (-0.5%)
FFL 13.61 Decreased By ▼ -0.29 (-2.09%)
HUBC 128.75 Decreased By ▼ -2.82 (-2.14%)
HUMNL 13.90 Decreased By ▼ -0.12 (-0.86%)
KEL 5.30 Decreased By ▼ -0.31 (-5.53%)
KOSM 7.35 Increased By ▲ 0.08 (1.1%)
MLCF 44.50 Decreased By ▼ -1.09 (-2.39%)
NBP 61.05 Decreased By ▼ -5.33 (-8.03%)
OGDC 216.80 Decreased By ▼ -3.96 (-1.79%)
PAEL 38.90 Increased By ▲ 0.42 (1.09%)
PIBTL 8.55 Decreased By ▼ -0.36 (-4.04%)
PPL 192.00 Decreased By ▼ -5.88 (-2.97%)
PRL 40.25 Increased By ▲ 1.22 (3.13%)
PTC 25.33 Decreased By ▼ -0.14 (-0.55%)
SEARL 105.63 Increased By ▲ 2.58 (2.5%)
TELE 8.70 Decreased By ▼ -0.32 (-3.55%)
TOMCL 36.30 Decreased By ▼ -0.11 (-0.3%)
TPLP 14.10 Increased By ▲ 0.35 (2.55%)
TREET 24.90 Decreased By ▼ -0.22 (-0.88%)
TRG 56.60 Decreased By ▼ -1.44 (-2.48%)
UNITY 33.40 Decreased By ▼ -0.27 (-0.8%)
WTL 1.62 Decreased By ▼ -0.09 (-5.26%)
BR100 11,749 Decreased By -141.1 (-1.19%)
BR30 36,622 Decreased By -734.8 (-1.97%)
KSE100 109,403 Decreased By -1667.7 (-1.5%)
KSE30 34,382 Decreased By -527.5 (-1.51%)

LAHORE: The Water and Sanitation Authority (Wasa) Lahore inaugurated Rs. 75 million ‘Chungi Amr Indus Shanghai Drain Rehabilitation Project’ on Monday.

Punjab Housing Minister Malik Asad Khokhar, political and social figures and senior officials attended the inaugural ceremony.

As per the details shared by the Wasa, the rainwater drain has been connected to the WASA sewerage system. The project was launched by Punjab Housing Minister Malik Asad Khokhar three months ago.

Commenting on the project, Wasa Deputy Managing Director Ghufran Ahmed said that a 2-km long pressurized sewer pipe was laid to connect the drain to the main sewerage system. “With the completion of this project, the long-standing problem of the residents of the area has been resolved; the rehabilitation of the Shanghai Drain will end the accumulation of water along the Shanghai Drain,” he added.

Copyright Business Recorder, 2022

Comments

Comments are closed.