AIRLINK 193.56 Decreased By ▼ -1.27 (-0.65%)
BOP 9.95 Increased By ▲ 0.14 (1.43%)
CNERGY 7.93 Increased By ▲ 0.57 (7.74%)
FCCL 40.65 Increased By ▲ 2.07 (5.37%)
FFL 16.86 Increased By ▲ 0.41 (2.49%)
FLYNG 27.75 Increased By ▲ 0.21 (0.76%)
HUBC 132.58 Increased By ▲ 0.83 (0.63%)
HUMNL 13.89 Increased By ▲ 0.03 (0.22%)
KEL 4.60 Decreased By ▼ -0.06 (-1.29%)
KOSM 6.62 Decreased By ▼ -0.04 (-0.6%)
MLCF 47.60 Increased By ▲ 2.21 (4.87%)
OGDC 213.91 Decreased By ▼ -0.08 (-0.04%)
PACE 6.93 Increased By ▲ 0.07 (1.02%)
PAEL 41.24 Increased By ▲ 1.18 (2.95%)
PIAHCLA 17.15 Increased By ▲ 0.36 (2.14%)
PIBTL 8.41 Increased By ▲ 0.09 (1.08%)
POWER 9.64 Increased By ▲ 0.21 (2.23%)
PPL 182.35 Increased By ▲ 0.16 (0.09%)
PRL 41.96 Increased By ▲ 0.13 (0.31%)
PTC 24.90 Increased By ▲ 0.34 (1.38%)
SEARL 106.84 Increased By ▲ 4.31 (4.2%)
SILK 0.99 Decreased By ▼ -0.01 (-1%)
SSGC 40.10 Increased By ▲ 0.66 (1.67%)
SYM 17.47 Increased By ▲ 0.14 (0.81%)
TELE 8.84 Increased By ▲ 0.08 (0.91%)
TPLP 12.75 No Change ▼ 0.00 (0%)
TRG 66.95 Increased By ▲ 1.55 (2.37%)
WAVESAPP 11.33 Increased By ▲ 0.22 (1.98%)
WTL 1.79 Increased By ▲ 0.09 (5.29%)
YOUW 4.07 Increased By ▲ 0.13 (3.3%)
BR100 12,045 Increased By 70.8 (0.59%)
BR30 36,580 Increased By 433.6 (1.2%)
KSE100 114,038 Increased By 594.4 (0.52%)
KSE30 35,794 Increased By 159 (0.45%)

Hub Power Company Ltd (HUBCO) in its notice to the Pakistan Stock Exchange (PSX) on Friday informed that its two engines at Narowal Energy Plant developed fault and are unavailable for electricity generation.

“The alternators of two engines at Narowal Plant have developed a fault due to which these engines having 38 MW capacity will not be available for electricity generation and have been placed under forced outages to investigate and fix the fault,” read the statement.

Narowal Plant is owned and operated by Narowal Energy Limited, a wholly owned subsidiary of the Hub Power Company Limited, and has a gross capacity of 225 MW comprising of eleven reciprocating engines and one steam turbine.

The Hub Power Company Limited (HUBCO) has a combined installed power generation capacity of 2,921MW.

HUBCO has four projects listed in the China-Pakistan Economic Corridor (CPEC), including imported coal-based China Power Hub Generation Company (Private) Limited (CPHGC) at Hub, Thar Energy Limited (TEL), ThalNova Power Thar (Pvt.) Ltd. and Sindh Engro Coal Mining Company (SECMC) at Thar Coal Block II.

As per HUBCO annual report for 2021, the consolidated net profit during the year under review is Rs33,688 million, resulting in earnings per share of Rs25.97 compared to net profit of Rs25,044 million and earnings per share of Rs19.31 last year.

The increase in profits is mainly due to higher share of profit from an associate (China Power Hub Power Generation Company Limited, which started Commercial Operations on August 17, 2019), depreciation of Rupee against USD and lower financing cost partly offset by higher taxes on income from management services.

Comments

Comments are closed.