AIRLINK 195.20 Increased By ▲ 3.36 (1.75%)
BOP 10.18 Increased By ▲ 0.31 (3.14%)
CNERGY 7.96 Increased By ▲ 0.29 (3.78%)
FCCL 38.48 Increased By ▲ 0.62 (1.64%)
FFL 16.06 Increased By ▲ 0.30 (1.9%)
FLYNG 25.50 Increased By ▲ 0.19 (0.75%)
HUBC 130.90 Increased By ▲ 0.73 (0.56%)
HUMNL 13.97 Increased By ▲ 0.38 (2.8%)
KEL 4.67 No Change ▼ 0.00 (0%)
KOSM 6.33 Increased By ▲ 0.12 (1.93%)
MLCF 45.25 Increased By ▲ 0.96 (2.17%)
OGDC 210.20 Increased By ▲ 3.33 (1.61%)
PACE 6.68 Increased By ▲ 0.12 (1.83%)
PAEL 41.22 Increased By ▲ 0.67 (1.65%)
PIAHCLA 17.76 Increased By ▲ 0.17 (0.97%)
PIBTL 8.15 Increased By ▲ 0.08 (0.99%)
POWER 9.36 Increased By ▲ 0.12 (1.3%)
PPL 181.54 Increased By ▲ 2.98 (1.67%)
PRL 40.25 Increased By ▲ 1.17 (2.99%)
PTC 24.74 Increased By ▲ 0.60 (2.49%)
SEARL 110.90 Increased By ▲ 3.05 (2.83%)
SILK 0.99 Increased By ▲ 0.02 (2.06%)
SSGC 38.78 Decreased By ▼ -0.33 (-0.84%)
SYM 19.28 Increased By ▲ 0.16 (0.84%)
TELE 8.70 Increased By ▲ 0.10 (1.16%)
TPLP 12.40 Increased By ▲ 0.03 (0.24%)
TRG 66.39 Increased By ▲ 0.38 (0.58%)
WAVESAPP 12.47 Decreased By ▼ -0.31 (-2.43%)
WTL 1.70 No Change ▼ 0.00 (0%)
YOUW 3.99 Increased By ▲ 0.04 (1.01%)
BR100 12,097 Increased By 166.3 (1.39%)
BR30 36,124 Increased By 464.1 (1.3%)
KSE100 114,970 Increased By 1763.4 (1.56%)
KSE30 36,153 Increased By 587.5 (1.65%)

ISLAMABAD: The Ministry of Information Technology and Telecommunication has prepared PC-1 of “Strengthening of ICT Infrastructure and Office Automation of President Secretariat (Aiwan-e-Sadr) Phase-II with an estimated cost of Rs138.87 million.

National Information Technology Board will execute the project, while its operation and maintenance would be President’s Secretariat responsibility.

The PC-1 is initiated on the directions of President’s Secretariat.

Strengthening of ICT infrastructure and automation at President Secretariat will improve productivity of routine function. This will help in time and efforts spent in information retrieval, search and dissemination within the government as well reduction in cycle time for responsiveness to citizens.

This will also provide architecture to implement schemes to enable inter-organizational and public access to information by implementation of workflow applications such as e-Office. Business processes that are accomplish by moving paper can be manage electronically from the very beginning to the final destination and will result in improve operational efficiency through maximum use of ICT to enable less paper environment in the Aiwan-e-Sadr that will reduce operational cost.

The project is proposed to be financed through the PSDP allocation of IT and Telecom Division of the Ministry of Information Technology and Telecommunications.

This project will establish/enhance IT infrastructure in all the wings of President’s Secretariat in order to implement various automated systems like E-office application suite in President’s Secretariat.

In March 2017, PC-1 of the first Phase of project was designed according to the given IT infrastructure/hardware/software/LAN, etc. requirement of President’s Secretariat, to accommodate (226) active users. Now at present President’s Secretariat wants to equip every relevant employee (500 approx) of the President Secretariat, with IT for optimum use and to benefit the government, in more effective manners. Due to this there is an increasing need of ICT infrastructure. At present following problems are being faced during daily operations including shortage of hardware, non-existence of LAN (at 7th floor and Network extension required for South Gate for R&I Sections of PS (Public and Personal), non-availability of security appliances/hardware, non-existence of Licensed Software, extension/upgradation work required in server room, non-availability of IT HR to carry out IT operations and support.

There is need to upgrade the ICT infrastructure in the President’s Secretariat that will fulfill the needs of E-Governance for the several years to come.

The proposed project will strengthen the ICT infrastructure to pave the way for implementation of automation software’s.

Technical parameters and technology transfer aspects of the project include, IT infrastructure/Hardware, Provision of essential hardware including branded Desktop PCs, laptops, scanners and printers for the employees of President’s Secretariat, for the smooth daily operations, Provision of branded servers to provide real-time, high-speed and secure connectivity between users within President’s Secretariat, Establishment of LAN with Active and Passive equipment (at 7th floor and Network extension for South Gate for R&I Sections of PS.

Copyright Business Recorder, 2022

Comments

Comments are closed.