AGL 38.02 Increased By ▲ 0.08 (0.21%)
AIRLINK 197.36 Increased By ▲ 3.45 (1.78%)
BOP 9.54 Increased By ▲ 0.22 (2.36%)
CNERGY 5.91 Increased By ▲ 0.07 (1.2%)
DCL 8.82 Increased By ▲ 0.14 (1.61%)
DFML 35.74 Decreased By ▼ -0.72 (-1.97%)
DGKC 96.86 Increased By ▲ 4.32 (4.67%)
FCCL 35.25 Increased By ▲ 1.28 (3.77%)
FFBL 88.94 Increased By ▲ 6.64 (8.07%)
FFL 13.17 Increased By ▲ 0.42 (3.29%)
HUBC 127.55 Increased By ▲ 6.94 (5.75%)
HUMNL 13.50 Decreased By ▼ -0.10 (-0.74%)
KEL 5.32 Increased By ▲ 0.10 (1.92%)
KOSM 7.00 Increased By ▲ 0.48 (7.36%)
MLCF 44.70 Increased By ▲ 2.59 (6.15%)
NBP 61.42 Increased By ▲ 1.61 (2.69%)
OGDC 214.67 Increased By ▲ 3.50 (1.66%)
PAEL 38.79 Increased By ▲ 1.21 (3.22%)
PIBTL 8.25 Increased By ▲ 0.18 (2.23%)
PPL 193.08 Increased By ▲ 2.76 (1.45%)
PRL 38.66 Increased By ▲ 0.49 (1.28%)
PTC 25.80 Increased By ▲ 2.35 (10.02%)
SEARL 103.60 Increased By ▲ 5.66 (5.78%)
TELE 8.30 Increased By ▲ 0.08 (0.97%)
TOMCL 35.00 Decreased By ▼ -0.03 (-0.09%)
TPLP 13.30 Decreased By ▼ -0.25 (-1.85%)
TREET 22.16 Decreased By ▼ -0.57 (-2.51%)
TRG 55.59 Increased By ▲ 2.72 (5.14%)
UNITY 32.97 Increased By ▲ 0.01 (0.03%)
WTL 1.60 Increased By ▲ 0.08 (5.26%)
BR100 11,727 Increased By 342.7 (3.01%)
BR30 36,377 Increased By 1165.1 (3.31%)
KSE100 109,513 Increased By 3238.2 (3.05%)
KSE30 34,513 Increased By 1160.1 (3.48%)

KARACHI: The Sindh government has started construction work on Karachi’s Red Line Bus Rapid Transit (BRT) project, according to Trans Karachi–the operator of Karachi Breeze System.

As per reports, the construction work on Karachi Bus Rapid Transit Red Line started on March 14. In the first phase, the route from Tank Chowk near Malir Halt to Safoora Chowrangi will be completed.

In this connection, the traffic police have issued alternate routes to ensure a smooth flow of traffic in the construction site area.

According to a plan, the traffic police have advised people to avoid Tank Chowk to Saforra Chowrangi via Check Post No 6, Malir Cantt route.

People coming from M9 motorway and Malir Cantt can take University Road opposite to Malir Cantt Check Post No. 5 to go towards Safoora Chowrangi.

Similarly, the commuters coming from Tank Chowk can take Cantt Road if want to go towards University Road. Commuters coming from Tank Check/Model Colony can take the Cantt Road to go towards Pehalwan Goth.

RED LINE BRT

The Red Line will span 26 km from Safoora to Tower. It is expected to have an average daily ridership of 625,000 passengers.

The route of the 26-kilometer BRT Red Line project will connect Model Colony to Johar Complex en route Jinnah Avenue and Malir Cantt while the buses will run through University Road, Hassan Square and Numaish roundabout.

24 stations would be constructed on this line which will run from Malir Halt to Numaish via Model Colony, Safoora Goth, King Cottages, Met Office, NED University, Safari Park, Nipa, Urdu University, Masjid Baitul Mukarram, Civic Centre, Askari Park, Dawood University and Society Office.

A biogas plant will be installed on a 31-acre land in Bhens Colony area of Karachi, which will be used for fulfilling the fuel needs of the bus service.

Comments

Comments are closed.