AIRLINK 193.50 Decreased By ▼ -1.51 (-0.77%)
BOP 9.64 Decreased By ▼ -0.13 (-1.33%)
CNERGY 7.53 Increased By ▲ 0.17 (2.31%)
FCCL 37.70 Decreased By ▼ -1.07 (-2.76%)
FFL 15.60 Increased By ▲ 0.01 (0.06%)
FLYNG 25.59 Increased By ▲ 0.18 (0.71%)
HUBC 127.07 Decreased By ▼ -1.55 (-1.21%)
HUMNL 13.50 Decreased By ▼ -0.31 (-2.24%)
KEL 4.58 Increased By ▲ 0.09 (2%)
KOSM 6.10 Decreased By ▼ -0.20 (-3.17%)
MLCF 43.96 Decreased By ▼ -0.83 (-1.85%)
OGDC 203.24 Decreased By ▼ -0.36 (-0.18%)
PACE 6.40 Decreased By ▼ -0.02 (-0.31%)
PAEL 40.98 Decreased By ▼ -0.15 (-0.36%)
PIAHCLA 17.49 Increased By ▲ 0.77 (4.61%)
PIBTL 7.66 Decreased By ▼ -0.02 (-0.26%)
POWER 9.08 Increased By ▲ 0.04 (0.44%)
PPL 174.25 Increased By ▲ 0.34 (0.2%)
PRL 38.07 Decreased By ▼ -1.01 (-2.58%)
PTC 24.07 Decreased By ▼ -0.97 (-3.87%)
SEARL 107.24 Decreased By ▼ -1.82 (-1.67%)
SILK 0.97 Decreased By ▼ -0.02 (-2.02%)
SSGC 36.40 Decreased By ▼ -1.74 (-4.56%)
SYM 19.04 Decreased By ▼ -0.45 (-2.31%)
TELE 8.24 Decreased By ▼ -0.12 (-1.44%)
TPLP 11.78 Decreased By ▼ -0.35 (-2.89%)
TRG 64.88 Increased By ▲ 0.09 (0.14%)
WAVESAPP 11.63 Increased By ▲ 1.06 (10.03%)
WTL 1.68 Decreased By ▼ -0.01 (-0.59%)
YOUW 3.85 Decreased By ▼ -0.02 (-0.52%)
BR100 11,765 Decreased By -123.2 (-1.04%)
BR30 34,986 Decreased By -233.6 (-0.66%)
KSE100 111,487 Decreased By -543 (-0.48%)
KSE30 34,934 Decreased By -201.5 (-0.57%)

ISLAMABAD: Federal Minister for Water Resources Syed Khurshid Ahmad Shah on Sunday said that timely completion of under-construction water projects was the top most priority of the government.

He said the country could face the worst water crisis in case of failure to meet the prescribed time limit.

In a statement, he said that Diamer Bhasha Dam, Dasu Dam, Tha Kot Dam, and Patan Dam were vital to overcoming the energy crisis in the country adding that the prudent utilization of water resources are imperative for the country.

The Federal Minister said that the country could not tolerate a moment’s delay or negligence in the construction of these reservoirs, it was a matter of national integrity. “We have been here for a year, but in the meantime, we will work on a war footing,” he added. The Federal Minister directed the concerned agencies to make immediate feasibility of the tunnel to be constructed on Diamer Bhasha Dam.

Diamer Bhasha Dam would have a live storage capacity of 6.4 MAF. The dam is being constructed on river Indus – 40 km downstream of Chilas town. The installed capacity of the dam is 4500 MW of cheap power.

Dasu Hydro Power Project is a vital project that would trigger a new era of socio-economic development in the country and stabilize Pakistan’s economy by providing low-cost hydel electricity to the masses.

Similarly, the Thakot hydropower project will have a capacity of 4,000 MW and produce annual energy of 21,300 GWh for the national grid.

Patan hydropower project’s Powerhouse is situated on the left bank near Patan Village, and 305 km from Islamabad. It has installed capacity of 2400mw.

Comments

Comments are closed.