AGL 38.48 Decreased By ▼ -0.08 (-0.21%)
AIRLINK 203.02 Decreased By ▼ -4.75 (-2.29%)
BOP 10.17 Increased By ▲ 0.11 (1.09%)
CNERGY 6.54 Decreased By ▼ -0.54 (-7.63%)
DCL 9.58 Decreased By ▼ -0.41 (-4.1%)
DFML 40.02 Decreased By ▼ -1.12 (-2.72%)
DGKC 98.08 Decreased By ▼ -5.38 (-5.2%)
FCCL 34.96 Decreased By ▼ -1.39 (-3.82%)
FFBL 86.43 Decreased By ▼ -5.16 (-5.63%)
FFL 13.90 Decreased By ▼ -0.70 (-4.79%)
HUBC 131.57 Decreased By ▼ -7.86 (-5.64%)
HUMNL 14.02 Decreased By ▼ -0.08 (-0.57%)
KEL 5.61 Decreased By ▼ -0.36 (-6.03%)
KOSM 7.27 Decreased By ▼ -0.59 (-7.51%)
MLCF 45.59 Decreased By ▼ -1.69 (-3.57%)
NBP 66.38 Decreased By ▼ -7.38 (-10.01%)
OGDC 220.76 Decreased By ▼ -1.90 (-0.85%)
PAEL 38.48 Increased By ▲ 0.37 (0.97%)
PIBTL 8.91 Decreased By ▼ -0.36 (-3.88%)
PPL 197.88 Decreased By ▼ -7.97 (-3.87%)
PRL 39.03 Decreased By ▼ -0.82 (-2.06%)
PTC 25.47 Decreased By ▼ -1.15 (-4.32%)
SEARL 103.05 Decreased By ▼ -7.19 (-6.52%)
TELE 9.02 Decreased By ▼ -0.21 (-2.28%)
TOMCL 36.41 Decreased By ▼ -1.80 (-4.71%)
TPLP 13.75 Decreased By ▼ -0.02 (-0.15%)
TREET 25.12 Decreased By ▼ -1.33 (-5.03%)
TRG 58.04 Decreased By ▼ -2.50 (-4.13%)
UNITY 33.67 Decreased By ▼ -0.47 (-1.38%)
WTL 1.71 Decreased By ▼ -0.17 (-9.04%)
BR100 11,890 Decreased By -408.8 (-3.32%)
BR30 37,357 Decreased By -1520.9 (-3.91%)
KSE100 111,070 Decreased By -3790.4 (-3.3%)
KSE30 34,909 Decreased By -1287 (-3.56%)

LAHORE: Chairman Wapda Lt Gen Sajjad Ghani (r) visited Diamer Basha Dam, being constructed on River Indus, 40km downstream of Chilas town. DG FWO Maj Gen Kamal Azfar accompanied him during the visit. CEO Diamer Basha Dam Company, GM/PD Diamer Basha Dam Project, CEO Diamer Basha Consultants Group, and representatives of the Contractors i.e. Power China and FWO were also present on the occasion.

The Chairman Wapda visited the sites of dam abutments, diversion system, permanent access bridge and the contractors’ camps and reviewed construction activities there. Earlier, the project management briefed him about targets and progress on the project.

He was briefed that construction work is continuing simultaneously on 10 different sites which include access roads, permanent access bridge across River Indus downstream of main dam, excavation of dam abutments from the top, diversion tunnel, diversion canal and power intake etc. The project is scheduled to be completed in 2029.

It is pertinent to mention that Diamer Basha Dam will have a gross water storage capacity of 8.1 MAF to irrigate 1.23 million acres of additional land. With installed power generation capacity of 4,500MW, the project will provide 18 billion green and low-cost electricity units on average to the national grid every year. With completion of Diamer Basha Dam, the life of Tarbela Dam will also increase by another 35 years.

A sum of Rs78.5 billion has been earmarked for CBMs in the project area for uplift of the locals. Besides, 4,100 people hailing from the project area have so far been provided employment opportunities on the project. Jobs for locals will further increase, as the project progresses ahead.

Copyright Business Recorder, 2022

Comments

Comments are closed.