AGL 38.02 Increased By ▲ 0.08 (0.21%)
AIRLINK 197.36 Increased By ▲ 3.45 (1.78%)
BOP 9.54 Increased By ▲ 0.22 (2.36%)
CNERGY 5.91 Increased By ▲ 0.07 (1.2%)
DCL 8.82 Increased By ▲ 0.14 (1.61%)
DFML 35.74 Decreased By ▼ -0.72 (-1.97%)
DGKC 96.86 Increased By ▲ 4.32 (4.67%)
FCCL 35.25 Increased By ▲ 1.28 (3.77%)
FFBL 88.94 Increased By ▲ 6.64 (8.07%)
FFL 13.17 Increased By ▲ 0.42 (3.29%)
HUBC 127.55 Increased By ▲ 6.94 (5.75%)
HUMNL 13.50 Decreased By ▼ -0.10 (-0.74%)
KEL 5.32 Increased By ▲ 0.10 (1.92%)
KOSM 7.00 Increased By ▲ 0.48 (7.36%)
MLCF 44.70 Increased By ▲ 2.59 (6.15%)
NBP 61.42 Increased By ▲ 1.61 (2.69%)
OGDC 214.67 Increased By ▲ 3.50 (1.66%)
PAEL 38.79 Increased By ▲ 1.21 (3.22%)
PIBTL 8.25 Increased By ▲ 0.18 (2.23%)
PPL 193.08 Increased By ▲ 2.76 (1.45%)
PRL 38.66 Increased By ▲ 0.49 (1.28%)
PTC 25.80 Increased By ▲ 2.35 (10.02%)
SEARL 103.60 Increased By ▲ 5.66 (5.78%)
TELE 8.30 Increased By ▲ 0.08 (0.97%)
TOMCL 35.00 Decreased By ▼ -0.03 (-0.09%)
TPLP 13.30 Decreased By ▼ -0.25 (-1.85%)
TREET 22.16 Decreased By ▼ -0.57 (-2.51%)
TRG 55.59 Increased By ▲ 2.72 (5.14%)
UNITY 32.97 Increased By ▲ 0.01 (0.03%)
WTL 1.60 Increased By ▲ 0.08 (5.26%)
BR100 11,727 Increased By 342.7 (3.01%)
BR30 36,377 Increased By 1165.1 (3.31%)
KSE100 109,513 Increased By 3238.2 (3.05%)
KSE30 34,513 Increased By 1160.1 (3.48%)

JOHANNESBURG: Guinea have been stripped of the right to host the 2025 Africa Cup of Nations finals and the bidding for the tournament is set to be reopened on Saturday, the Confederation of African football announced early on Saturday.

It follows a meeting on Friday in Conakry between Guinea’s interim president, Colonel Mamady Doumbouya, and the president of African football’s governing body, Patrice Motsepe, to discuss the withdrawal after the west African country, among the poorest of the continent, said it was not ready to host the 24-nation tournament.

“I visited Guinea out of respect to the people of Guinea to discuss CAF’s willingness to advise and work together with the football stakeholders to construct and build football infrastructure and facilities in this country, in the light of the decision by CAF not to proceed with the AFCON 2025 in Guinea,” Motsepe said in a statement.

Although just announced, the decision had been made as early as June, sources told Reuters.

The CAF executive committee will be meeting in Algiers on Saturday and will take a decision to reopen the bidding process for the 2025 tournament, the CAF statement said. In 2014, Guinea originally were awarded the hosting rights to the 2023 finals, along with Cameroon (2019) and Ivory Coast (2021).

But Cameroon were stripped of the right to host the 2019 tournament, as they were not ready, with Egypt filling in. Cameroon were then awarded the 2021 tournament, which eventually took place earlier this year after a one-year postponement because of the COVID-19 pandemic.

Maradona ‘Hand of God’ shirt to go on display during World Cup

The Ivory Coast were due to host the next tournament in mid-2023 but that has been moved to early 2024 after concerns over the weather at that time of the year in the region.

The expansion of the Cup of Nations finals to 24 teams in 2019 meant Guinea’s sparse infrastructure was always going to be stretched and the decision is no surprise.

The country suffered a coup one year ago when special forces commander Doumbouya ousted President Alpha Conde.

A year earlier, Conde had changed the constitution to circumvent limits that would have prevented him from standing for a third term, triggering widespread rioting.

Doumbouya became interim president and promised a transition to democratic elections within three years.

The 15-member Economic Community of West African States rejected the timeline and imposed sanctions on junta members and their relatives, including freezing their bank accounts.

In July, the regional bloc gave Guinea until Oct. 22 to establish a “reasonable” timetable, or face additional sanctions.

Comments

Comments are closed.