AGL 40.50 Increased By ▲ 0.30 (0.75%)
AIRLINK 128.95 Decreased By ▼ -0.16 (-0.12%)
BOP 6.35 Decreased By ▼ -0.25 (-3.79%)
CNERGY 4.12 Increased By ▲ 0.09 (2.23%)
DCL 8.63 Increased By ▲ 0.18 (2.13%)
DFML 42.29 Increased By ▲ 1.04 (2.52%)
DGKC 87.76 Increased By ▲ 0.76 (0.87%)
FCCL 33.60 Increased By ▲ 0.25 (0.75%)
FFBL 66.75 Increased By ▲ 0.85 (1.29%)
FFL 10.70 Increased By ▲ 0.16 (1.52%)
HUBC 112.70 Increased By ▲ 2.00 (1.81%)
HUMNL 15.82 Increased By ▲ 0.59 (3.87%)
KEL 4.79 Increased By ▲ 0.01 (0.21%)
KOSM 7.89 Increased By ▲ 0.06 (0.77%)
MLCF 41.95 Increased By ▲ 0.05 (0.12%)
NBP 61.10 Increased By ▲ 0.60 (0.99%)
OGDC 189.20 Increased By ▲ 6.40 (3.5%)
PAEL 25.50 Increased By ▲ 0.14 (0.55%)
PIBTL 7.26 Increased By ▲ 1.00 (15.97%)
PPL 149.01 Increased By ▲ 1.20 (0.81%)
PRL 25.10 Increased By ▲ 0.54 (2.2%)
PTC 16.37 Increased By ▲ 0.13 (0.8%)
SEARL 70.58 Increased By ▲ 0.08 (0.11%)
TELE 7.35 Increased By ▲ 0.05 (0.68%)
TOMCL 36.01 Decreased By ▼ -0.29 (-0.8%)
TPLP 8.06 Increased By ▲ 0.21 (2.68%)
TREET 16.25 Increased By ▲ 0.95 (6.21%)
TRG 51.50 Decreased By ▼ -0.20 (-0.39%)
UNITY 27.30 Decreased By ▼ -0.05 (-0.18%)
WTL 1.28 Increased By ▲ 0.05 (4.07%)
BR100 9,916 Increased By 73.7 (0.75%)
BR30 30,464 Increased By 427.5 (1.42%)
KSE100 93,167 Increased By 646.6 (0.7%)
KSE30 28,952 Increased By 165.9 (0.58%)

KARACHI: Administrator Karachi Barrister Murtaza Wahab on Friday directed the Director General Engineering Department of Karachi Metropolitan Corporation (KMC) to complete the under-construction roads within the stipulated 45 days in any case.

Officials said that the Engineering Department is carrying out construction and lining of more than 20 roads in different areas of the city under special grant of Rs.1 billion from the Sindh government.

The roads of District Central where construction work has started immediately included Gharibabad to Usman Memorial Hospital, Madina Masjid Food Street, Ziauddin Hospital Chowrangi to Mujahid Colony, Sir Syed Girls College to Lasbela Chowrangi, Bada Maidan to Khilifat Chowk and M. Mateen Food Road. These roads are being constructed at a cost of Rs. 50 million each.

In East District University Road, Sindhi Muslim Society Chowrangi and Commercial Area, Link Road Tipu Sultan, Mubarak Shaheed Road is being constructed.

In South District, construction work is in progress on Shahrah e Attar and adjacent areas, Shahrah e Iran, Shahrah e Liaquat, MA Jinnah Road at a cost of Rs. 50 million each.

Similarly in Malir district, Khalid Bin Waleed Road is under construction from Bhens Colony to Mehran Highway. Hyedri Chowk Road, Ammar Yasir Phase One and internal streets, and the road from Qadeer Chowk to Nafees Cinema are also under construction.

In West and Keamari Districts, Jackson Market Road and adjacent areas roads and Site Flyover to Lyari Expressway are also being repaired or constructed. Similarly, flyovers and expansion joints of bridges are also being replaced.

Copyright Business Recorder, 2022

Comments

Comments are closed.