AIRLINK 193.70 Increased By ▲ 0.20 (0.1%)
BOP 9.89 Increased By ▲ 0.25 (2.59%)
CNERGY 7.64 Increased By ▲ 0.11 (1.46%)
FCCL 37.65 Decreased By ▼ -0.05 (-0.13%)
FFL 15.57 Decreased By ▼ -0.03 (-0.19%)
FLYNG 25.58 Decreased By ▼ -0.01 (-0.04%)
HUBC 129.48 Increased By ▲ 2.41 (1.9%)
HUMNL 13.57 Increased By ▲ 0.07 (0.52%)
KEL 4.64 Increased By ▲ 0.06 (1.31%)
KOSM 6.27 Increased By ▲ 0.17 (2.79%)
MLCF 44.15 Increased By ▲ 0.19 (0.43%)
OGDC 205.30 Increased By ▲ 2.06 (1.01%)
PACE 6.50 Increased By ▲ 0.10 (1.56%)
PAEL 40.79 Decreased By ▼ -0.19 (-0.46%)
PIAHCLA 17.30 Decreased By ▼ -0.19 (-1.09%)
PIBTL 8.05 Increased By ▲ 0.39 (5.09%)
POWER 9.15 Increased By ▲ 0.07 (0.77%)
PPL 175.69 Increased By ▲ 1.44 (0.83%)
PRL 38.00 Decreased By ▼ -0.07 (-0.18%)
PTC 24.40 Increased By ▲ 0.33 (1.37%)
SEARL 107.50 Increased By ▲ 0.26 (0.24%)
SILK 0.99 Increased By ▲ 0.02 (2.06%)
SSGC 38.70 Increased By ▲ 2.30 (6.32%)
SYM 19.27 Increased By ▲ 0.23 (1.21%)
TELE 8.59 Increased By ▲ 0.35 (4.25%)
TPLP 12.40 Increased By ▲ 0.62 (5.26%)
TRG 66.00 Increased By ▲ 1.12 (1.73%)
WAVESAPP 12.79 Increased By ▲ 1.16 (9.97%)
WTL 1.70 Increased By ▲ 0.02 (1.19%)
YOUW 3.90 Increased By ▲ 0.05 (1.3%)
BR100 11,846 Increased By 78.3 (0.67%)
BR30 35,363 Increased By 399.3 (1.14%)
KSE100 112,353 Increased By 865.9 (0.78%)
KSE30 35,224 Increased By 289.3 (0.83%)

ISLAMABAD: The Executive Committee of the National Economic Council (ECNEC) has approved, in principle, up-gradation of Pakistan Railways existing main Line-1 (ML-1) project at the total cost of US$ 9,851.079 million and Karachi Circular Railway (KCR) at the total cost Rs 292,388 million with foreign share of Rs 263,149 million.

The meeting of the ECNEC presided over by Finance Minister Ishaq Dar considered and approved, in principle, Ministry of Railways modified PC-1 for up-gradation of Pakistan Railways existing Main Line-1 (ML-1) project at the total cost of US$ 9,851.079 million subject to recommendation of cost, technical details and preferably an equity participation financial model.

The meeting was informed that ML-1 starts from Karachi, passes through Kotri, Hyderabad, Rohri, Multan, Lahore, Rawalpindi and terminates at Peshawar.

The ECNEC considered and approved, in principle, Karachi Circular Railway (KCR) project at total cost Rs. 292,388 million with foreign share of Rs. 263,149 million. The meeting was told that the project envisages construction of 44-kilometre long and dedicated track of modern urban railway in Karachi starting from Drigh Road, passes through areas including Gulshan-e-Iqbal, Federal B area, Liaquatabad, North Nazimabad, Nazimabad, SITE, and Lyari.

PR clarifies no contract issued for upgrading ML-1

The ECNEC also discussed and approved, in principle, establishment of 48-MW Shounter hydropower project in district Neelum, AJK subject to revision of cost based on exchange rate of dollar @ Rs. 220. The project envisages construction of 48-MW Hydro Power Project located on the lower part of Baral River which is right bank tributary of Neelum River, near Kel town village Shounter in Neelum Valley.

The meeting was attended by Federal Minister for Planning, Development and Special Initiatives Ahsan Iqbal, Federal Minister for Commerce Syed Naveed Qamar, Planning & Development Minister of Balochistan Noor Muhammad Dummar, Federal Secretaries, Chairman FBR and other senior officers from Federal, as well as, senior provincial officials.

Copyright Business Recorder, 2022

Comments

Comments are closed.