AGL 36.51 Decreased By ▼ -1.49 (-3.92%)
AIRLINK 216.01 Increased By ▲ 2.10 (0.98%)
BOP 9.46 Increased By ▲ 0.04 (0.42%)
CNERGY 6.59 Increased By ▲ 0.30 (4.77%)
DCL 8.50 Decreased By ▼ -0.27 (-3.08%)
DFML 40.90 Decreased By ▼ -1.31 (-3.1%)
DGKC 99.48 Increased By ▲ 5.36 (5.69%)
FCCL 36.48 Increased By ▲ 1.29 (3.67%)
FFBL 88.94 No Change ▼ 0.00 (0%)
FFL 17.17 Increased By ▲ 0.78 (4.76%)
HUBC 126.25 Decreased By ▼ -0.65 (-0.51%)
HUMNL 13.35 Decreased By ▼ -0.02 (-0.15%)
KEL 5.24 Decreased By ▼ -0.07 (-1.32%)
KOSM 6.71 Decreased By ▼ -0.23 (-3.31%)
MLCF 44.24 Increased By ▲ 1.26 (2.93%)
NBP 60.50 Increased By ▲ 1.65 (2.8%)
OGDC 222.49 Increased By ▲ 3.07 (1.4%)
PAEL 40.60 Increased By ▲ 1.44 (3.68%)
PIBTL 8.16 Decreased By ▼ -0.02 (-0.24%)
PPL 191.99 Increased By ▲ 0.33 (0.17%)
PRL 38.60 Increased By ▲ 0.68 (1.79%)
PTC 27.00 Increased By ▲ 0.66 (2.51%)
SEARL 103.50 Decreased By ▼ -0.50 (-0.48%)
TELE 8.62 Increased By ▲ 0.23 (2.74%)
TOMCL 34.86 Increased By ▲ 0.11 (0.32%)
TPLP 13.60 Increased By ▲ 0.72 (5.59%)
TREET 24.99 Decreased By ▼ -0.35 (-1.38%)
TRG 71.99 Increased By ▲ 1.54 (2.19%)
UNITY 33.33 Decreased By ▼ -0.06 (-0.18%)
WTL 1.72 No Change ▼ 0.00 (0%)
BR100 11,987 Increased By 93.1 (0.78%)
BR30 37,178 Increased By 323.2 (0.88%)
KSE100 111,351 Increased By 927.9 (0.84%)
KSE30 35,039 Increased By 261 (0.75%)

ISLAMABAD: The Executive Committee of the National Economic Council (ECNEC) has approved, in principle, up-gradation of Pakistan Railways existing main Line-1 (ML-1) project at the total cost of US$ 9,851.079 million and Karachi Circular Railway (KCR) at the total cost Rs 292,388 million with foreign share of Rs 263,149 million.

The meeting of the ECNEC presided over by Finance Minister Ishaq Dar considered and approved, in principle, Ministry of Railways modified PC-1 for up-gradation of Pakistan Railways existing Main Line-1 (ML-1) project at the total cost of US$ 9,851.079 million subject to recommendation of cost, technical details and preferably an equity participation financial model.

The meeting was informed that ML-1 starts from Karachi, passes through Kotri, Hyderabad, Rohri, Multan, Lahore, Rawalpindi and terminates at Peshawar.

The ECNEC considered and approved, in principle, Karachi Circular Railway (KCR) project at total cost Rs. 292,388 million with foreign share of Rs. 263,149 million. The meeting was told that the project envisages construction of 44-kilometre long and dedicated track of modern urban railway in Karachi starting from Drigh Road, passes through areas including Gulshan-e-Iqbal, Federal B area, Liaquatabad, North Nazimabad, Nazimabad, SITE, and Lyari.

PR clarifies no contract issued for upgrading ML-1

The ECNEC also discussed and approved, in principle, establishment of 48-MW Shounter hydropower project in district Neelum, AJK subject to revision of cost based on exchange rate of dollar @ Rs. 220. The project envisages construction of 48-MW Hydro Power Project located on the lower part of Baral River which is right bank tributary of Neelum River, near Kel town village Shounter in Neelum Valley.

The meeting was attended by Federal Minister for Planning, Development and Special Initiatives Ahsan Iqbal, Federal Minister for Commerce Syed Naveed Qamar, Planning & Development Minister of Balochistan Noor Muhammad Dummar, Federal Secretaries, Chairman FBR and other senior officers from Federal, as well as, senior provincial officials.

Copyright Business Recorder, 2022

Comments

Comments are closed.