AIRLINK 191.84 Decreased By ▼ -1.66 (-0.86%)
BOP 9.87 Increased By ▲ 0.23 (2.39%)
CNERGY 7.67 Increased By ▲ 0.14 (1.86%)
FCCL 37.86 Increased By ▲ 0.16 (0.42%)
FFL 15.76 Increased By ▲ 0.16 (1.03%)
FLYNG 25.31 Decreased By ▼ -0.28 (-1.09%)
HUBC 130.17 Increased By ▲ 3.10 (2.44%)
HUMNL 13.59 Increased By ▲ 0.09 (0.67%)
KEL 4.67 Increased By ▲ 0.09 (1.97%)
KOSM 6.21 Increased By ▲ 0.11 (1.8%)
MLCF 44.29 Increased By ▲ 0.33 (0.75%)
OGDC 206.87 Increased By ▲ 3.63 (1.79%)
PACE 6.56 Increased By ▲ 0.16 (2.5%)
PAEL 40.55 Decreased By ▼ -0.43 (-1.05%)
PIAHCLA 17.59 Increased By ▲ 0.10 (0.57%)
PIBTL 8.07 Increased By ▲ 0.41 (5.35%)
POWER 9.24 Increased By ▲ 0.16 (1.76%)
PPL 178.56 Increased By ▲ 4.31 (2.47%)
PRL 39.08 Increased By ▲ 1.01 (2.65%)
PTC 24.14 Increased By ▲ 0.07 (0.29%)
SEARL 107.85 Increased By ▲ 0.61 (0.57%)
SILK 0.97 No Change ▼ 0.00 (0%)
SSGC 39.11 Increased By ▲ 2.71 (7.45%)
SYM 19.12 Increased By ▲ 0.08 (0.42%)
TELE 8.60 Increased By ▲ 0.36 (4.37%)
TPLP 12.37 Increased By ▲ 0.59 (5.01%)
TRG 66.01 Increased By ▲ 1.13 (1.74%)
WAVESAPP 12.78 Increased By ▲ 1.15 (9.89%)
WTL 1.70 Increased By ▲ 0.02 (1.19%)
YOUW 3.95 Increased By ▲ 0.10 (2.6%)
BR100 11,930 Increased By 162.4 (1.38%)
BR30 35,660 Increased By 695.9 (1.99%)
KSE100 113,206 Increased By 1719 (1.54%)
KSE30 35,565 Increased By 630.8 (1.81%)
Pakistan

Sukkur-Hyderabad Motorway: PM wants more projects on public-private partnership model

  • Performs ground-breaking of 306-km-long Hyderabad-Sukkur Motorway (M-6)
Published December 13, 2022

Prime Minister Shehbaz Sharif on Tuesday directed authorities to pursue more projects on a Public-Private Partnership (PPP) model across Pakistan. The remarks were made while he was addressing the foundation-stone laying ceremony of the 306-km-long Hyderabad-Sukkur Motorway (M-6) in Sukkur, which will be built at a cost of Rs307 billion.

“This project was delayed for a long period … however, it will now be completed in a period of 30 months, and will start benefitting the citizens of Sindh and Pakistan,” said PM Shehbaz.

M-6 is the last part of the Peshawar-Karachi route after which all major cities will be connected by the motorway.

The prime minister said the material used in the construction of the said project would be similar to that utilised in the construction of motorways across Pakistan. “Through our joint efforts we will achieve this quality and completion period,” he said.

The 306km project is based on a PPP mode of construction.

“I urge the Ministry of Planning to come forward and plan key projects on the basis of PPP, in order to encourage this model of investment in Pakistan,” he said.

PM rejects default speculations with much vehemence

The prime minister lauded the role of Sindh Chief Minister Murad Ali Shah in the promotion of PPP model in the province, urging authorities to promote it in other provinces as well.

He stressed on the importance of better road connections to Balochistan: “Without the development of Balochistan, Pakistan's development is incomplete,” he said.

PM for united efforts to steer country out of all challenges

As per the National Highway Authority (NHA), the construction of the M-6 will create over 6,500 (direct) and 25,000 (indirect) jobs. The project will complete the North-South Motorway Corridor and reduce travel time between Hyderabad and Sukkur by 50%. It will also help in the economic growth of Sindh and uplift adjoining districts.

Comments

Comments are closed.

Shan Ali Dec 13, 2022 11:23pm
All the IMF shareholders must be knowing how much loan Pakistan has received since 1947. IMF also knows the exact breakup of funds received by each political party during their tenure. IMF should also know the numbers and cost of each project within the tenure of either party's government. IMF also knows which opposition party had disturbed more to the ruling party through protests, agitation and defamation resulted instability and insecurity within the country.
thumb_up Recommended (0)