AGL 40.21 Increased By ▲ 0.18 (0.45%)
AIRLINK 127.64 Decreased By ▼ -0.06 (-0.05%)
BOP 6.67 Increased By ▲ 0.06 (0.91%)
CNERGY 4.45 Decreased By ▼ -0.15 (-3.26%)
DCL 8.73 Decreased By ▼ -0.06 (-0.68%)
DFML 41.16 Decreased By ▼ -0.42 (-1.01%)
DGKC 86.11 Increased By ▲ 0.32 (0.37%)
FCCL 32.56 Increased By ▲ 0.07 (0.22%)
FFBL 64.38 Increased By ▲ 0.35 (0.55%)
FFL 11.61 Increased By ▲ 1.06 (10.05%)
HUBC 112.46 Increased By ▲ 1.69 (1.53%)
HUMNL 14.81 Decreased By ▼ -0.26 (-1.73%)
KEL 5.04 Increased By ▲ 0.16 (3.28%)
KOSM 7.36 Decreased By ▼ -0.09 (-1.21%)
MLCF 40.33 Decreased By ▼ -0.19 (-0.47%)
NBP 61.08 Increased By ▲ 0.03 (0.05%)
OGDC 194.18 Decreased By ▼ -0.69 (-0.35%)
PAEL 26.91 Decreased By ▼ -0.60 (-2.18%)
PIBTL 7.28 Decreased By ▼ -0.53 (-6.79%)
PPL 152.68 Increased By ▲ 0.15 (0.1%)
PRL 26.22 Decreased By ▼ -0.36 (-1.35%)
PTC 16.14 Decreased By ▼ -0.12 (-0.74%)
SEARL 85.70 Increased By ▲ 1.56 (1.85%)
TELE 7.67 Decreased By ▼ -0.29 (-3.64%)
TOMCL 36.47 Decreased By ▼ -0.13 (-0.36%)
TPLP 8.79 Increased By ▲ 0.13 (1.5%)
TREET 16.84 Decreased By ▼ -0.82 (-4.64%)
TRG 62.74 Increased By ▲ 4.12 (7.03%)
UNITY 28.20 Increased By ▲ 1.34 (4.99%)
WTL 1.34 Decreased By ▼ -0.04 (-2.9%)
BR100 10,086 Increased By 85.5 (0.85%)
BR30 31,170 Increased By 168.1 (0.54%)
KSE100 94,764 Increased By 571.8 (0.61%)
KSE30 29,410 Increased By 209 (0.72%)

KARACHI: Sindh Chief Minister Syed Murad Ali Shah has said that 1320-MW of coal-fired energy has been added to the national grid this month and another 660-MW would be added next year.

“The solution to the country’s energy crisis lies in Thar coal,” he said on Monday while presiding over a board meeting of Thar Coal Energy here.

Minister Energy Imtiaz Shaikh briefing the meeting said that Sino-Sindh Resources (SSR) started coal excavation work in Block-I in January 2022 it has completed 99 percent work to excavate 7.8-mtpa coal by December 31, 2022. He added that it was a CPEC project.

The Power Engineering Company has installed two 660-MW coal-fired power plants for $2 billion. Both the power plants successfully synchronized with the national grid on December 2 and December 11, 2022, respectively.

Imtiaz Shaikh said that SECM planned to expand the mine from 7.6 Mtpa to 12.2 Mtpa mine. He said that Lucky Electric Power has started work on a 660-MW power plant for which it would be supplied 3.6 Mtpa coal. This plant would start commercial operation in 2024.

Thar Energy has already synchronized its 330 MW coal-fired power plant with the national Grid in October 2022 and another 330-MW plant would start commercial operation by 2023.

The meeting was attended by Minister Education Syed Sardar Shah, Minister Energy Imtiaz Shaikh, Advisor Law Murtaza Wahab, Chief Secretary Sohail Rajput, PSCM Fayaz Jatoi, DG Coal Authority Khadim Channa, and others. Minister BISP Shazia Marri, Special Assistant to PM Tariq Bajwa, Federal Secretary Energy Rashid Langrial, Federal Secretary Law Raja Naeem Akbar, and others attended the meeting through video link.

Copyright Business Recorder, 2022

Comments

Comments are closed.