AGL 40.00 Decreased By ▼ -0.16 (-0.4%)
AIRLINK 129.53 Decreased By ▼ -2.20 (-1.67%)
BOP 6.68 Decreased By ▼ -0.01 (-0.15%)
CNERGY 4.63 Increased By ▲ 0.16 (3.58%)
DCL 8.94 Increased By ▲ 0.12 (1.36%)
DFML 41.69 Increased By ▲ 1.08 (2.66%)
DGKC 83.77 Decreased By ▼ -0.31 (-0.37%)
FCCL 32.77 Increased By ▲ 0.43 (1.33%)
FFBL 75.47 Increased By ▲ 6.86 (10%)
FFL 11.47 Increased By ▲ 0.12 (1.06%)
HUBC 110.55 Decreased By ▼ -1.21 (-1.08%)
HUMNL 14.56 Increased By ▲ 0.25 (1.75%)
KEL 5.39 Increased By ▲ 0.17 (3.26%)
KOSM 8.40 Decreased By ▼ -0.58 (-6.46%)
MLCF 39.79 Increased By ▲ 0.36 (0.91%)
NBP 60.29 No Change ▼ 0.00 (0%)
OGDC 199.66 Increased By ▲ 4.72 (2.42%)
PAEL 26.65 Decreased By ▼ -0.04 (-0.15%)
PIBTL 7.66 Increased By ▲ 0.18 (2.41%)
PPL 157.92 Increased By ▲ 2.15 (1.38%)
PRL 26.73 Increased By ▲ 0.05 (0.19%)
PTC 18.46 Increased By ▲ 0.16 (0.87%)
SEARL 82.44 Decreased By ▼ -0.58 (-0.7%)
TELE 8.31 Increased By ▲ 0.08 (0.97%)
TOMCL 34.51 Decreased By ▼ -0.04 (-0.12%)
TPLP 9.06 Increased By ▲ 0.25 (2.84%)
TREET 17.47 Increased By ▲ 0.77 (4.61%)
TRG 61.32 Decreased By ▼ -1.13 (-1.81%)
UNITY 27.43 Decreased By ▼ -0.01 (-0.04%)
WTL 1.38 Increased By ▲ 0.10 (7.81%)
BR100 10,407 Increased By 220 (2.16%)
BR30 31,713 Increased By 377.1 (1.2%)
KSE100 97,328 Increased By 1781.9 (1.86%)
KSE30 30,192 Increased By 614.4 (2.08%)

ISLAMABAD: K-Electric (KE) has proposed three structures for its participation in the second unit of Jamshoro coal power plant (2x600 MW), saying that the development of the project can be fast-tracked by structuring the transaction under G2G framework with Saudi Arabia.

In a letter to Power Minister Khurram Dastgir Khan, CEO KE Syed Moonis Abdullah Alvi shared the outcome of the recently held meetings of the Prime Minister’s Task Force (PMTF) headed by former Prime Minister, Shahid Khaqan Abbasi, wherein it was decided that supply from National Grid to KE would be restricted to only 1,000 MW on a firm basis whereas supply over and above 1,000 MW would only be made available based on the demand and supply situation in National Grid and on pro-rata basis with other Discos.

The CEO said considering the GoP offer, it has now become pivotal that the project is made available to KE at the earliest in order to cater to the ever rising power demand in the city of Karachi.

KE has appreciated the PMTF’S directives to the concerned agencies to fully assist and to expedite the evaluation and possibilities to this effect.

Jamshoro coal power plant (Genco-1): KE interested in purchasing power

The letter states that several actions were taken pursuant to directive “issued by your Ministry on November 03, 2022, authorizing the formulation of a Technical Committee (TC) of relevant stakeholders in relation to the project.

The TC has already conducted two meetings on December 28, 2022 and January11, 2023, whereby several aspects of the arrangement were deliberated to formulate the probable road map for creating a successful transaction structure.

Additionally, representatives of the TC conducted a project site visit on January 9, 2023. Subsequent to the site visit, it was agreed in the TC meeting held on January 11, 2023 that KE would prepare a Site Visit Report which would include the key technical, regulatory and commercial considerations that have been identified, along with a broad contour of the transaction structure under the applicable regulatory frameworks.

KE has initiated preparation of this Report which will be submitted to the TC in due course.” As per the report, KE has highlighted the following key considerations, which are vital for the onwards development of the project:

1- Clarity of available Financing for Unit-2: Considering that this is one of the most crucial elements of the transaction, KE has requested all concerned agencies of the Government of Pakistan (GoP) to retain interest of the existing sovereign funds, like the Saudi Fund for Development (SDF), and Kuwait Fund for Arab Economic Development (KFAED) for the development of Unit-2 in private mode.

KE believes that support from Ministry of Energy (MoE) and the other concerned ministries and departments of the GoP will be critical in securing the financing for the project, as KE, along with its own efforts, would also need continued support and facilitation from the GoP in this regard.

2- Separation of Common Facilities: Since both Units of the Project were designed to be operated as a combined facility, many common facilities were included in the project design. To develop unit-2 in a distinct private structure, separation amongst the common facilities is critical from both technical and regulatory perspectives.

3- Change of Design: Both units of the Project have been designed to utilize mix of imported and local coal (80% imported sub-bituminous coal and 20% local Thar lignite coal). As Unit-2 is now conceived on 100% local coal, critical design modifications will be required for development of Unit-2, based upon detailed studies.

4- Lender’s Consent: Consent of Asian Development Bank (ADB) that is the existing lender of the project will be essential for the separation of Unit-1 and 2 of the projects.

5- Scheme of Power Evacuation by KE: A detailed study will be required for this purpose to gain firm clarity on the most optimal scheme for power evacuation.

Copyright Business Recorder, 2023

Comments

Comments are closed.

Muhammed Jan 26, 2023 12:51pm
Why KE is eager to participate in Jamshoro power plant which is still only on papers whereas many IPPs are already in operation in its vicinity?
thumb_up Recommended (0)