AIRLINK 196.38 Increased By ▲ 4.54 (2.37%)
BOP 10.11 Increased By ▲ 0.24 (2.43%)
CNERGY 7.75 Increased By ▲ 0.08 (1.04%)
FCCL 38.10 Increased By ▲ 0.24 (0.63%)
FFL 15.74 Decreased By ▼ -0.02 (-0.13%)
FLYNG 24.54 Decreased By ▼ -0.77 (-3.04%)
HUBC 130.38 Increased By ▲ 0.21 (0.16%)
HUMNL 13.73 Increased By ▲ 0.14 (1.03%)
KEL 4.60 Decreased By ▼ -0.07 (-1.5%)
KOSM 6.19 Decreased By ▼ -0.02 (-0.32%)
MLCF 44.85 Increased By ▲ 0.56 (1.26%)
OGDC 206.51 Decreased By ▼ -0.36 (-0.17%)
PACE 6.58 Increased By ▲ 0.02 (0.3%)
PAEL 39.77 Decreased By ▼ -0.78 (-1.92%)
PIAHCLA 17.20 Decreased By ▼ -0.39 (-2.22%)
PIBTL 7.99 Decreased By ▼ -0.08 (-0.99%)
POWER 9.20 Decreased By ▼ -0.04 (-0.43%)
PPL 178.91 Increased By ▲ 0.35 (0.2%)
PRL 38.93 Decreased By ▼ -0.15 (-0.38%)
PTC 24.31 Increased By ▲ 0.17 (0.7%)
SEARL 109.27 Increased By ▲ 1.42 (1.32%)
SILK 1.00 Increased By ▲ 0.03 (3.09%)
SSGC 37.75 Decreased By ▼ -1.36 (-3.48%)
SYM 18.83 Decreased By ▼ -0.29 (-1.52%)
TELE 8.53 Decreased By ▼ -0.07 (-0.81%)
TPLP 12.14 Decreased By ▼ -0.23 (-1.86%)
TRG 64.76 Decreased By ▼ -1.25 (-1.89%)
WAVESAPP 12.11 Decreased By ▼ -0.67 (-5.24%)
WTL 1.64 Decreased By ▼ -0.06 (-3.53%)
YOUW 3.87 Decreased By ▼ -0.08 (-2.03%)
BR100 12,000 Increased By 69.2 (0.58%)
BR30 35,548 Decreased By -112 (-0.31%)
KSE100 114,256 Increased By 1049.3 (0.93%)
KSE30 35,870 Increased By 304.3 (0.86%)

PESHAWAR: Secretary Khyber Pakhtunkhwa Energy & Power, Nisar Ahmad Khan has agreed with the estimated cost for restoration the flood-affected power plant of 36.6 megawatt Daral Khawar Hydropower Project.

The Secretary Energy & Power Nisar Ahmad Khan and PEDO Chief Executive Engineer Naeem Khan along with the team of expert engineers working on the project paid an emergency visit to Daral Khawar powerhouse Swat despite severe cold and heavy snowfall, said a press release issued here on Sunday.

During briefing, the Secretary Energy and Power was told that the Daral Khawar power plant under the supervision of PEDO was successfully completed by a team of Chinese and local engineers in 2021. The project is earning Rs.1.30 billion annually to the province, but the power plant has been severely damaged due to the recent catastrophic floods. Secretary Energy Nisar Ahmad Khan inspected the spillway, sand trap, power channel, switch yard and other parts of the flood-affected powerhouse thoroughly and issued necessary instructions to the CEO PEDO Naeem Khan regarding the repair of the power house.

He also praised the Chief Engineers of PEDO and their team who participated in the maintenance and safety works by staying at the project site for 1 month continuously for the immediate protection of the destroyed power plant.

Later, the Secretary Energy during a high-level meeting rejected the report issued by the inspection team that reviewed the costs of the damages in Daral Khawar power plant and issued orders to invalidate the inspection team. He said that the said team consisted of non-technical persons who wrongly denied expenditure by misunderstanding certain matters on the basis of ignorance. He issued instructions to reconstitute the inspection team of the institution.

The Secretary also expressed satisfaction over the details of costs incurred for the restoration of the power house in PC-1 by the PEDO engineers and said that the site of the damaged power house has been thoroughly inspected along with the PEDO Chief, therefore the details of the expenses have been declared satisfactory.

He directed that PC-1 immediately submit to Planning & Development department to start the restoration work on the destroyed power plant on an emergency basis after approval so that the production of electricity can be resumed which is very necessary for the interest of the province.

Copyright Business Recorder, 2023

Comments

Comments are closed.