AIRLINK 194.01 Increased By ▲ 0.51 (0.26%)
BOP 9.77 Increased By ▲ 0.13 (1.35%)
CNERGY 7.60 Increased By ▲ 0.07 (0.93%)
FCCL 37.80 Increased By ▲ 0.10 (0.27%)
FFL 15.67 Increased By ▲ 0.07 (0.45%)
FLYNG 25.94 Increased By ▲ 0.35 (1.37%)
HUBC 128.99 Increased By ▲ 1.92 (1.51%)
HUMNL 13.60 Increased By ▲ 0.10 (0.74%)
KEL 4.60 Increased By ▲ 0.02 (0.44%)
KOSM 6.25 Increased By ▲ 0.15 (2.46%)
MLCF 44.20 Increased By ▲ 0.24 (0.55%)
OGDC 205.85 Increased By ▲ 2.61 (1.28%)
PACE 6.47 Increased By ▲ 0.07 (1.09%)
PAEL 40.88 Decreased By ▼ -0.10 (-0.24%)
PIAHCLA 17.42 Decreased By ▼ -0.07 (-0.4%)
PIBTL 7.81 Increased By ▲ 0.15 (1.96%)
POWER 9.18 Increased By ▲ 0.10 (1.1%)
PPL 176.99 Increased By ▲ 2.74 (1.57%)
PRL 38.20 Increased By ▲ 0.13 (0.34%)
PTC 24.37 Increased By ▲ 0.30 (1.25%)
SEARL 107.60 Increased By ▲ 0.36 (0.34%)
SILK 0.98 Increased By ▲ 0.01 (1.03%)
SSGC 37.00 Increased By ▲ 0.60 (1.65%)
SYM 18.96 Decreased By ▼ -0.08 (-0.42%)
TELE 8.44 Increased By ▲ 0.20 (2.43%)
TPLP 12.17 Increased By ▲ 0.39 (3.31%)
TRG 66.25 Increased By ▲ 1.37 (2.11%)
WAVESAPP 11.84 Increased By ▲ 0.21 (1.81%)
WTL 1.69 Increased By ▲ 0.01 (0.6%)
YOUW 3.95 Increased By ▲ 0.10 (2.6%)
BR100 11,855 Increased By 87.3 (0.74%)
BR30 35,389 Increased By 425.2 (1.22%)
KSE100 112,370 Increased By 882.7 (0.79%)
KSE30 35,245 Increased By 310.6 (0.89%)

ISLAMABAD: The government has so far released funds amounting to Rs 2474.87 million, under the Public Sector Development Programme (PSDP 2022-23) against a total allocation of Rs2484.87 million to execute 15 different projects and schemes aimed at ensuring improved aviation sector services in the country.

Out of the total authorization/disbursement of Rs 2474.87 million, around Rs462.39 million have been utilized on the aviation sector projects during a seven-month period (July-January) of the current fiscal year, according to official data available with APP.

As per the PSDP document, an amount of Rs 2.303 billion had been allocated for 10 ongoing schemes, out of which Rs 60 million were meant for construction of Airport Security Force Camp at Islamabad International Airport, Rs 29.871 million for building barrack accommodation for ASP personnel along with Mess and allied facilities, ladies rest room, MT, Store, Kote Magazine, Quarterguard and OC accommodation/room at Skardu Airport, Rs4 million for construction of Barrack accommodation for ASF personnel along with Mess and allied facilities, MT, Store, Visitors Room, Ladies Rest Room, Kote Magazine, Quarter Guard, and OC accommodation/Room at Chitral Airport, Rs 5 million for construction of double storey Barracks for ASF at Faisalabad Airport, Rs 5 million for construction of Rain Water Harvesting Kasana Dam at Islamabad International Airport, Rs 25 million for installation of Weather Surveillance Radar at Karachi, Rs580 million for installation of Weather Surveillance Radar at Multan, Rs 10 million for installation of Weather Surveillance Radar at Sukkur, Rs 2 billion for new Gwadar International Airport (NGIA project), Rs 150 million for up-gradation of ASF Academy, Karachi and Rs 15 million for up-gradation of ASF Academy, Karachi (Feasibility & Supervision).

Similarly, Rs 181 million had been earmarked for five new schemes, out of which Rs 61 million had been specified for the construction of ASF (Airport Security Force) Accommodation at Turbat Airport, Rs10 million for the construction of Kote Quarter Guard & Magazine at Panjgur Airport, Rs 5 million for the establishment of Basic Aerodrome Facilities at Mansehra - Acquisition of Land for Construction/Establishment of Airport at Mansehra, Rs 5 million for the establishment of New Meteorological Observatory at Naran and Hostel for Operational Staff at Balakot and Rs100 million for extension/up-gradation of Bannu Airport for A320/B737 or equivalent Aircraft Operation Phase-I (Land Acquisition).

Comments

Comments are closed.