AIRLINK 217.98 Decreased By ▼ -4.91 (-2.2%)
BOP 10.93 Increased By ▲ 0.11 (1.02%)
CNERGY 7.55 Decreased By ▼ -0.01 (-0.13%)
FCCL 34.83 Decreased By ▼ -2.24 (-6.04%)
FFL 19.32 Increased By ▲ 0.08 (0.42%)
FLYNG 25.15 Decreased By ▼ -1.89 (-6.99%)
HUBC 131.09 Decreased By ▼ -1.55 (-1.17%)
HUMNL 14.56 Decreased By ▼ -0.17 (-1.15%)
KEL 5.18 Decreased By ▼ -0.22 (-4.07%)
KOSM 7.36 Decreased By ▼ -0.12 (-1.6%)
MLCF 45.63 Decreased By ▼ -2.55 (-5.29%)
OGDC 222.08 Decreased By ▼ -1.18 (-0.53%)
PACE 8.16 Decreased By ▼ -0.02 (-0.24%)
PAEL 44.19 Increased By ▲ 0.69 (1.59%)
PIAHCLA 17.69 Decreased By ▼ -0.37 (-2.05%)
PIBTL 8.97 Decreased By ▼ -0.10 (-1.1%)
POWERPS 12.51 Decreased By ▼ -0.50 (-3.84%)
PPL 193.01 Decreased By ▼ -5.23 (-2.64%)
PRL 43.17 Increased By ▲ 0.93 (2.2%)
PTC 26.63 Decreased By ▼ -0.76 (-2.77%)
SEARL 107.08 Decreased By ▼ -3.00 (-2.73%)
SILK 1.04 Decreased By ▼ -0.02 (-1.89%)
SSGC 45.00 Decreased By ▼ -2.30 (-4.86%)
SYM 21.19 Increased By ▲ 0.42 (2.02%)
TELE 10.15 Decreased By ▼ -0.37 (-3.52%)
TPLP 14.51 Decreased By ▼ -0.44 (-2.94%)
TRG 67.28 Decreased By ▼ -1.57 (-2.28%)
WAVESAPP 11.29 Decreased By ▼ -0.63 (-5.29%)
WTL 1.70 Decreased By ▼ -0.09 (-5.03%)
YOUW 4.25 Decreased By ▼ -0.10 (-2.3%)
BR100 12,397 Increased By 33.3 (0.27%)
BR30 37,347 Decreased By -871.2 (-2.28%)
KSE100 117,587 Increased By 467.3 (0.4%)
KSE30 37,065 Increased By 128 (0.35%)

LAHORE: Commissioner Lahore Muhammad Ali Randhawa has said that the designs of the proposed elevated expressway project and Wasa’s tunnel boring project have been reviewed for compatibility and would not pose any future constraints due to capacity constraints.

“Moreover, the space would be left for the intersections, proposed in the Wasa’s project, in the design of the elevated expressway. The design of the elevated expressway would have space under the pillars as per WASA requirements. The proposed elevated expressway and WASA project are mega projects for the city,” he said while chairing a meeting held here on Wednesday to review the proposed projects.

The meeting was informed that the journey from the Main Boulevard Gulberg to the motorway toll plaza through the elevated expressway would be completed in just 10 minutes. Moreover, the length of the Wasa Trenchless Technology (tunnel boring) Drain was 28 km from Larex Colony to Gulshan Ravi.

MD Wasa Ghafran Ahmed, Chief Engineer LDA Asrar Saeed, Director Development Javed Rashid Chauhan and NESPAK were also present in the meeting.

Copyright Business Recorder, 2023

Comments

Comments are closed.